Bill of Quantities and Takeoff Services in the UK

A bill of quantities lists the measured quantities of work in a project so every tenderer prices the same scope. Nova Estimation measures your drawings, marks up each sheet in colour and delivers the quantities in Excel, usually within 24 to 48 hours.

  • Fixed fee before work starts
  • Editable Excel and marked-up PDFs
  • Second estimator check
UK

What is a bill of quantities?

A bill of quantities is a structured list of the items in a project with a measured quantity and unit for each. It lets several contractors or subcontractors price exactly the same scope.

Without prices, it is the starting point for tendering, comparing quotes and checking a contractor's figure against the measured work.

Detail

How do we measure and present it?

Quantities are taken in Bluebeam or PlanSwift directly from your drawings. Each measured item is highlighted on the sheet it came from, so you can see exactly what was counted.

The bill is delivered in Excel, grouped in the order you ask for, with units, notes and open queries listed alongside.

Included

What do you receive?

  • Excel bill

    Quantities and units, grouped as you need.

  • Colour-coded markups

    Every measured item highlighted on your sheets.

  • Notes and queries

    Assumptions and gaps listed for the design team.

  • Second check

    Reviewed before delivery.

  • Editable file

    Add your own rates and columns.

  • Fixed fee

    Agreed before work starts.

How it works

How does ordering an estimate work?

You know the fee and the delivery date before we start. No retainers and no hourly billing.

  1. Upload

    Send the drawing set, specs and addenda with your bid date. A plan-room link works too.

    About 2 minutes
  2. Quote

    We review the sheets and confirm scope, fee and delivery date. Nothing starts until you say yes.

    Within the hour
  3. Estimate

    Takeoff in Bluebeam or PlanSwift, priced to your ZIP code, then checked by a second estimator.

    24 to 48 hours
  4. Deliver

    You get the workbook, markups and bid summary, and we answer questions until your bid is in.

    Bid day ready

Bid due this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

FAQ

Questions about bill of quantities and takeoff services

No. It lists measured quantities only. If you want prices, order a cost estimate.

Yes. The Excel file is editable, so you can price it with your own rates.

We measure in Bluebeam Revu and PlanSwift and deliver quantities in Excel with marked-up PDFs.

Most estimates are delivered in 24 to 48 hours after you approve the fixed fee. The quote comes back within the hour on working days.

As a fixed fee quoted from your drawings before any work starts. There is no hourly billing and no retainer.

An editable Excel workbook with the formulas intact, marked-up PDFs of your drawings and a summary with inclusions and exclusions.

The drawing set, any specification and addenda, and the date you need the figures. A plan-room link works as well as a PDF or DWG upload.

Yes. A second estimator reviews every estimate before it is delivered, and the team includes an RICS-qualified quantity surveyor.

Get a fixed quote

Ready to price your next bid?

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.