Service
Bid & Procurement
Bid packages, scope sheets and subcontractor quote leveling, so every sub is pricing the same measured extent and the gaps are visible before award.
- Turnaround
- Matched to your bid calendar
- Delivered as
- Excel · PDF · marked-up plans
- Pricing
- Fixed fee, quoted up front
- Quality
- Second-estimator review
Overview
What this service does.
Leveling sub quotes is slow when every sub has priced a different scope. We build scope sheets and bid packages from measured quantities, so every subcontractor prices the same extent, then level the quotes that come back line by line. Gaps, exclusions and outliers become visible before award, when they can still be fixed for free.
Who it’s for
- General contractors managing sub bids
- Owners running competitive tenders
- Construction managers at risk
What’s included
- Bid packages split by trade with measured quantities
- Scope sheets with inclusions and exclusions
- Subcontractor bid leveling and comparison
- Plug numbers for missing or late bids
- Award recommendation notes
What you receive
Everything you need to bid. Nothing you have to redo.
Every estimate ships as the same four-part package, on the first job and the fiftieth.
=ROUND(C4*D4*(1+$E$2),2)| CSI | Line item | Quantity | |
|---|---|---|---|
| 2 | 03 30 00 | Cast-in-place concrete | 46 CY |
| 3 | 03 20 00 | Reinforcing steel | 0.86 TON |
| 4 | 05 12 00 | Structural steel framing | 38.4 TON |
| 5 | 09 21 16 | Gypsum board assemblies | 18,420 SF |
| 6 | 09 65 19 | LVT flooring | 2,140 SF |
| 7 | 23 31 13 | Ductwork — galvanized | 4,860 LB |
| 8 | 26 05 19 | Building wire & cable | 12,300 LF |
- LVT flooring2,140 SF
- Partition type A412 LF
- Flush wood doors18 EA
- Sheet A-2013 items
Bid summary · Sample
3-story office — base bid
- Bid date
- Thu, 4:00 PM
- Location
- Austin, TX
- Set
- Addendum 2
- 03 Concrete22%
- 05 Metals14%
- 09 Finishes26%
- 22 Plumbing9%
- 23 HVAC17%
- 26 Electrical12%
Alternates and allowances listed separately · Page 1 of 3
Scope letter · Sample
Inclusions, exclusions & RFIs
Included
- Formwork & accessories
- Vapor barrier under slab
- Embeds per S-501
Excluded
- Winter protection
- Testing & inspection
- Dewatering
RFIs
- Slab thickness at grid C-4?
- Door 214 hardware set?
- Roof drain size conflict
How it works
From plan set to bid‑ready in three steps.
No retainer, no subscription and nothing measured until you approve the fee.
- Drop plans hereA-201 Floor plans.pdf12 MBProject manual.pdf4 MBStep 1
Upload your drawings
Plans, specs, addenda and the bid date — PDF, DWG or a plan-room link.
Takes 2 minutes Fixed quote
- Scope
- Div. 03–09
- Delivery
- Thu, 10:00 AM
- Revisions
- Addenda included
Step 2Get a fixed quote
An estimator reviews the scope and confirms the fee and delivery date.
Within the hour- estimate.xlsxbid-summary.pdfmarkup-set.pdfscope-and-rfis.pdfStep 3
Receive a bid-ready package
Live Excel workbook, PDF summary, marked-up plans and written scope.
Usually 24–48 h
FAQ
Bid & Procurement, answered.
Talk to an estimator
Not a salesperson. Same-day answers on working days.
+1 518 974 7222[email protected]Do you contact subcontractors for us?
We prepare the packages and level the returns. Outreach stays with you, so your relationships stay yours, but we can supply a list of the scopes still uncovered.
What happens when a sub excludes part of the scope?
We flag the exclusion and price the missing piece from our own quantities, so the leveled comparison is like for like.
Can you level bids from a job we did not estimate?
Yes. We take off the relevant scopes first so there is a measured baseline to level against.
Can you use our cost book and labor rates?
Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.
How does pricing work?
Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.
Keep exploring
Related services.
- ServiceConstruction EstimatingComplete priced estimates across every CSI division, from a concept budget to a hard bid, structured…View
- ServiceQuantity TakeoffMeasured quantities with no dollars attached, formatted for your own cost book, with a color-coded mark-up…View
- ServicePre-ConstructionConceptual and schematic budgets before there is a full drawing set, so cost is a design…View
- ServiceConstruction Cost ConsultingIndependent cost review, budget reconciliation and change order pricing — a second measured opinion when a…View
Start a quote
Have a bid coming up?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.
