Nova Estimation

Construction Cost Consultancy Services in the UK

Cost consultancy is an independent check on a project's numbers. Nova Estimation reviews budgets, tender returns and change requests against measured quantities, and because we do not build, our only interest is that the figure is right, which you can see line by line.

  • Fixed fee before work starts
  • Editable Excel and marked-up PDFs
  • Second estimator check
UK

What does a cost review involve?

We measure the work in the documents, price it independently and compare the result with the figure you have been given. Differences are traced to the lines that cause them.

You see where a number is low, high or based on a different scope, rather than just being told it differs.

Detail

When is an independent review useful?

Before accepting a contractor's price, when a budget looks out of line with the design, or when a change is priced and you want a second opinion.

It is also useful at handover points, such as a stage report or a funding review, where a figure needs support.

Included

What is included?

  • Independent measure

    Quantities taken from the documents.

  • Line comparison

    Your figure against ours.

  • Change pricing

    Variations priced and explained.

  • Written findings

    Differences and assumptions listed.

  • Excel file

    Editable, formulas intact.

  • Fixed fee

    Agreed before work starts.

How it works

How does ordering an estimate work?

You know the fee and the delivery date before we start. No retainers and no hourly billing.

  1. Upload

    Send the drawing set, specs and addenda with your bid date. A plan-room link works too.

    About 2 minutes
  2. Quote

    We review the sheets and confirm scope, fee and delivery date. Nothing starts until you say yes.

    Within the hour
  3. Estimate

    Takeoff in Bluebeam or PlanSwift, priced to your ZIP code, then checked by a second estimator.

    24 to 48 hours
  4. Deliver

    You get the workbook, markups and bid summary, and we answer questions until your bid is in.

    Bid day ready

Bid due this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

FAQ

Questions about construction cost consultancy services

Yes. On your engagement you are the client and we work for you, not for the contractors whose pricing we review.

Yes. Send the change documents and the original scope and we price the difference.

The budget, the documents it is based on and any assumptions you were given.

Most estimates are delivered in 24 to 48 hours after you approve the fixed fee. The quote comes back within the hour on working days.

As a fixed fee quoted from your drawings before any work starts. There is no hourly billing and no retainer.

An editable Excel workbook with the formulas intact, marked-up PDFs of your drawings and a summary with inclusions and exclusions.

The drawing set, any specification and addenda, and the date you need the figures. A plan-room link works as well as a PDF or DWG upload.

Yes. A second estimator reviews every estimate before it is delivered, and the team includes an RICS-qualified quantity surveyor.

Get a fixed quote

Ready to price your next bid?

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.