Division group · 10 trades
Architectural
The envelope and the finishes — roofing, cladding, openings, partitions and surfaces.
Trades in this group
- CSI 07
- Roofing
- CSI 07
- Siding
- CSI 07
- Insulation
- CSI 08
- Doors & Windows
- CSI 09
- Drywall
- CSI 09
- Flooring
How it works
From plan set to bid‑ready in three steps.
No retainer, no subscription and nothing measured until you approve the fee.
- Drop plans hereA-201 Floor plans.pdf12 MBProject manual.pdf4 MBStep 1
Upload your drawings
Plans, specs, addenda and the bid date — PDF, DWG or a plan-room link.
Takes 2 minutes Fixed quote
- Scope
- Div. 03–09
- Delivery
- Thu, 10:00 AM
- Revisions
- Addenda included
Step 2Get a fixed quote
An estimator reviews the scope and confirms the fee and delivery date.
Within the hour- estimate.xlsxbid-summary.pdfmarkup-set.pdfscope-and-rfis.pdfStep 3
Receive a bid-ready package
Live Excel workbook, PDF summary, marked-up plans and written scope.
Usually 24–48 h
Start a quote
Have a bid coming up?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.
