Division group · 5 trades
MEP
Mechanical, electrical and plumbing, each measured the way its own trade bids it.
Trades in this group
- CSI 26
- Electrical
- CSI 22
- Plumbing
- CSI 23
- HVAC
- CSI 23
- Mechanical
- CSI 21
- Fire Protection
In this group
Every trade in Navigation.
How it works
From plan set to bid‑ready in three steps.
No retainer, no subscription and nothing measured until you approve the fee.
- Drop plans hereA-201 Floor plans.pdf12 MBProject manual.pdf4 MBStep 1
Upload your drawings
Plans, specs, addenda and the bid date — PDF, DWG or a plan-room link.
Takes 2 minutes Fixed quote
- Scope
- Div. 03–09
- Delivery
- Thu, 10:00 AM
- Revisions
- Addenda included
Step 2Get a fixed quote
An estimator reviews the scope and confirms the fee and delivery date.
Within the hour- estimate.xlsxbid-summary.pdfmarkup-set.pdfscope-and-rfis.pdfStep 3
Receive a bid-ready package
Live Excel workbook, PDF summary, marked-up plans and written scope.
Usually 24–48 h
Start a quote
Have a bid coming up?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.
