Skip to content

Trades

31 trades, each measured the way it is bid.

Structural, architectural, MEP, civil and specialty scopes — every one read from its own drawing type and carried in the units the trade buys in.

At a glance
Turnaround
24–48 hours
Quote
Fixed fee within the hour
Delivered as
Excel · PDF · marked-up plans
Coverage
Contractors across the US
Get a fixed quote within the hour

Sample

How the line items come back.

Organized by CSI division, in the units each trade is bought in.

  • Quantities traced to the sheet they came from
  • Waste and productivity carried as visible lines
  • Formulas intact — edit any rate
estimate.xlsxFormulas on
Estimate — division summary
CSILine itemQuantity
03 30 00Cast-in-place concrete46 CY
05 12 00Structural steel framing38.4 TON
09 21 16Gypsum board assemblies18,420 SF
23 31 13Ductwork — galvanized4,860 LB
26 05 19Building wire & cable12,300 LF
Illustrative structure, not a real project. Every estimate is measured from your own drawings.

Start a quote

Have a bid coming up?

Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.