Sample estimates
See exactly what comes back.
Every Nova estimate uses the same structure: a live workbook, a bid summary, a marked-up plan set and a written scope.
The package
Four deliverables, one standard.
Every estimate ships as the same four-part package, on the first job and the fiftieth.
estimate.xlsxFormulas on
fx
=ROUND(C4*D4*(1+$E$2),2)| CSI | Line item | Quantity | |
|---|---|---|---|
| 2 | 03 30 00 | Cast-in-place concrete | 46 CY |
| 3 | 03 20 00 | Reinforcing steel | 0.86 TON |
| 4 | 05 12 00 | Structural steel framing | 38.4 TON |
| 5 | 09 21 16 | Gypsum board assemblies | 18,420 SF |
| 6 | 09 65 19 | LVT flooring | 2,140 SF |
| 7 | 23 31 13 | Ductwork — galvanized | 4,860 LB |
| 8 | 26 05 19 | Building wire & cable | 12,300 LF |
EstimateSummaryLaborScope
A-201 · Level 2 floor plan.pdf100%
- LVT flooring2,140 SF
- Partition type A412 LF
- Flush wood doors18 EA
- Sheet A-2013 items
bid-summary.pdf
Bid summary · Sample
3-story office — base bid
- Bid date
- Thu, 4:00 PM
- Location
- Austin, TX
- Set
- Addendum 2
- 03 Concrete22%
- 05 Metals14%
- 09 Finishes26%
- 22 Plumbing9%
- 23 HVAC17%
- 26 Electrical12%
Alternates and allowances listed separately · Page 1 of 3
scope-and-rfis.pdf
Scope letter · Sample
Inclusions, exclusions & RFIs
Included
- Formwork & accessories
- Vapor barrier under slab
- Embeds per S-501
Excluded
- Winter protection
- Testing & inspection
- Dewatering
RFIs
- Slab thickness at grid C-4?
- Door 214 hardware set?
- Roof drain size conflict
The workbook
Organized by CSI division, line by line.
Organized by CSI division, in the units each trade is bought in.
- Quantities traced to the sheet they came from
- Waste and productivity carried as visible lines
- Formulas intact — edit any rate
estimate.xlsxFormulas on
fx
=ROUND(C4*D4*(1+$E$2),2)| CSI | Line item | Quantity | |
|---|---|---|---|
| 2 | 03 30 00 | Cast-in-place concrete | 46 CY |
| 3 | 05 12 00 | Structural steel framing | 38.4 TON |
| 4 | 09 21 16 | Gypsum board assemblies | 18,420 SF |
| 5 | 23 31 13 | Ductwork — galvanized | 4,860 LB |
| 6 | 26 05 19 | Building wire & cable | 12,300 LF |
EstimateSummaryLaborScope
Trade-specific samples
Every trade page shows its own line items.
Pick a trade to see how its quantities come back.
- 03ConcreteStructural
- 04MasonryStructural
- 05Structural SteelStructural
- 06FramingStructural
- 06CarpentryStructural
- 03RebarStructural
- 07RoofingArchitectural
- 07SidingArchitectural
- 07InsulationArchitectural
- 08Doors & WindowsArchitectural
- 09DrywallArchitectural
- 09FlooringArchitectural
- 09PaintingArchitectural
- 09CeilingsArchitectural
- 06MillworkArchitectural
- 07WaterproofingArchitectural
- 26ElectricalMEP
- 22PlumbingMEP
- 23HVACMEP
- 23MechanicalMEP
- 21Fire ProtectionMEP
- 31EarthworkCivil & Sitework
- 31SiteworkCivil & Sitework
- 33UtilitiesCivil & Sitework
- 32PavingCivil & Sitework
- 32LandscapingCivil & Sitework
- 26SolarSpecialty Trades
- 27Low VoltageSpecialty Trades
- 28Access ControlSpecialty Trades
- 28Fire AlarmSpecialty Trades
- 13Swimming PoolSpecialty Trades
No trade matches that search — but we probably still estimate it.
Ask an estimatorStart a quote
Have a bid coming up?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.