Who we work with
Developers
Feasibility budgets early, and an independent check on contractor pricing when the numbers come back.
- →
- Pre-Construction
- →
- Construction Cost Consulting
- →
- Multifamily Estimating
For developers
Where the estimate earns its fee.
Developers need cost early, before a project is committed, and an independent check later, when contractor pricing arrives. We provide feasibility budgets from concept drawings and a measured second opinion on bids, so financing and go/no-go decisions rest on numbers you can explain.
Feasibility on thin information
Concept budgets with stated accuracy ranges, refined as design develops.
Bids that come in over budget
An independent estimate shows where the gap actually sits.
Lender and investor questions
Documented cost with quantities behind every line.
Recommended
Services that fit.
- RecommendedPre-ConstructionConceptual and schematic budgets before there is a full drawing set, so cost is a design…View
- RecommendedConstruction Cost ConsultingIndependent cost review, budget reconciliation and change order pricing — a second measured opinion when a…View
- RecommendedMultifamily EstimatingApartments, condos, townhomes and student housing, estimated by unit type and repeated across the building the…View
What you receive
Everything you need to bid. Nothing you have to redo.
Every estimate ships as the same four-part package, on the first job and the fiftieth.
=ROUND(C4*D4*(1+$E$2),2)| CSI | Line item | Quantity | |
|---|---|---|---|
| 2 | 03 30 00 | Cast-in-place concrete | 46 CY |
| 3 | 03 20 00 | Reinforcing steel | 0.86 TON |
| 4 | 05 12 00 | Structural steel framing | 38.4 TON |
| 5 | 09 21 16 | Gypsum board assemblies | 18,420 SF |
| 6 | 09 65 19 | LVT flooring | 2,140 SF |
| 7 | 23 31 13 | Ductwork — galvanized | 4,860 LB |
| 8 | 26 05 19 | Building wire & cable | 12,300 LF |
- LVT flooring2,140 SF
- Partition type A412 LF
- Flush wood doors18 EA
- Sheet A-2013 items
Bid summary · Sample
3-story office — base bid
- Bid date
- Thu, 4:00 PM
- Location
- Austin, TX
- Set
- Addendum 2
- 03 Concrete22%
- 05 Metals14%
- 09 Finishes26%
- 22 Plumbing9%
- 23 HVAC17%
- 26 Electrical12%
Alternates and allowances listed separately · Page 1 of 3
Scope letter · Sample
Inclusions, exclusions & RFIs
Included
- Formwork & accessories
- Vapor barrier under slab
- Embeds per S-501
Excluded
- Winter protection
- Testing & inspection
- Dewatering
RFIs
- Slab thickness at grid C-4?
- Door 214 hardware set?
- Roof drain size conflict
How it works
From plan set to bid‑ready in three steps.
No retainer, no subscription and nothing measured until you approve the fee.
- Drop plans hereA-201 Floor plans.pdf12 MBProject manual.pdf4 MBStep 1
Upload your drawings
Plans, specs, addenda and the bid date — PDF, DWG or a plan-room link.
Takes 2 minutes Fixed quote
- Scope
- Div. 03–09
- Delivery
- Thu, 10:00 AM
- Revisions
- Addenda included
Step 2Get a fixed quote
An estimator reviews the scope and confirms the fee and delivery date.
Within the hour- estimate.xlsxbid-summary.pdfmarkup-set.pdfscope-and-rfis.pdfStep 3
Receive a bid-ready package
Live Excel workbook, PDF summary, marked-up plans and written scope.
Usually 24–48 h
FAQ
Questions from developers.
Talk to an estimator
Not a salesperson. Same-day answers on working days.
+1 518 974 7222[email protected]How early can you estimate?
From a site plan and massing study. Accuracy ranges are stated and narrow as design develops.
Can you review a contractor's GMP?
Yes. We measure independently and reconcile against the GMP line by line.
Do you provide cost-to-complete for lenders?
Yes, based on the current set and progress documentation.
Can you use our cost book and labor rates?
Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.
How does pricing work?
Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.
Start a quote
Have a bid coming up?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.
