Cost Planning and Pre-construction Budgets in the UK
Cost planning gives you a budget for a project before the design is finished, so you can decide whether to proceed. Nova Estimation prepares budgets from early drawings or a brief and updates them as the design develops, delivered in Excel within days.
- Fixed fee before work starts
- Editable Excel and marked-up PDFs
- Second estimator check
What is a cost plan?
A cost plan sets out the expected cost of a project by element, built from early information such as sketches, areas and a written brief. Its job is to test feasibility and set a budget the design can be checked against.
Because the design is incomplete, a cost plan states its assumptions clearly. As drawings develop, the plan is updated and the changes are shown.
How do we prepare it?
You send what exists: sketches, schedules of accommodation, early drawings or a specification. We measure what can be measured, state allowances for what cannot and list every assumption.
The result is a budget you can compare against at each stage, with the difference between versions shown line by line.
What is in a cost plan?
-
Budget by element
Costs grouped in the order you need.
-
Stated assumptions
Every allowance and exclusion listed.
-
Stage updates
New versions as the design develops.
-
Comparison
Changes between versions shown.
-
Excel file
Editable, formulas intact.
-
Fixed fee
Agreed before work starts.
How does ordering an estimate work?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the drawing set, specs and addenda with your bid date. A plan-room link works too.
About 2 minutesQuote
We review the sheets and confirm scope, fee and delivery date. Nothing starts until you say yes.
Within the hourEstimate
Takeoff in Bluebeam or PlanSwift, priced to your ZIP code, then checked by a second estimator.
24 to 48 hoursDeliver
You get the workbook, markups and bid summary, and we answer questions until your bid is in.
Bid day ready
Bid due this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
Questions about cost planning and pre-construction budgets
Sketches, early drawings, areas or a written brief. The less detail there is, the more the plan relies on stated allowances.
Accuracy depends on the information available. Each plan states its assumptions, and accuracy improves as the design develops.
Yes. Each new stage is quoted as a fixed fee and shows what changed.
Most estimates are delivered in 24 to 48 hours after you approve the fixed fee. The quote comes back within the hour on working days.
As a fixed fee quoted from your drawings before any work starts. There is no hourly billing and no retainer.
An editable Excel workbook with the formulas intact, marked-up PDFs of your drawings and a summary with inclusions and exclusions.
The drawing set, any specification and addenda, and the date you need the figures. A plan-room link works as well as a PDF or DWG upload.
Yes. A second estimator reviews every estimate before it is delivered, and the team includes an RICS-qualified quantity surveyor.
Ready to price your next bid?
Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.