Groundworks and Civil Estimating in the UK
Groundworks and civil estimating covers the work in and around the ground: earthworks, drainage, utilities, paving, kerbs and external works. Nova Estimation measures volumes and runs from your drawings and delivers quantities or a priced estimate in Excel, usually within 24 to 48 hours.
- Fixed fee before work starts
- Editable Excel and marked-up PDFs
- Second estimator check
What do we measure in civil and groundworks work?
We read the drawings and specification for this group, measure each item in the unit it is bought in and mark every measured item on your sheets. Anything unclear is listed as a query for the design team.
You can order one trade from the group or all of them, with prices or as a bill of quantities.
Which trades are in this group?
The group covers earthworks, drainage, utilities, paving, kerbs and landscaping.
What is included?
-
Measured quantities
In the units each trade uses.
-
Colour-coded markups
Every item highlighted on your sheets.
-
Notes and queries
Open questions listed.
-
Excel file
Editable, formulas intact.
-
Second check
Reviewed before delivery.
-
Fixed fee
Agreed before work starts.
Which service goes with this trade group?
How does ordering an estimate work?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the drawing set, specs and addenda with your bid date. A plan-room link works too.
About 2 minutesQuote
We review the sheets and confirm scope, fee and delivery date. Nothing starts until you say yes.
Within the hourEstimate
Takeoff in Bluebeam or PlanSwift, priced to your ZIP code, then checked by a second estimator.
24 to 48 hoursDeliver
You get the workbook, markups and bid summary, and we answer questions until your bid is in.
Bid day ready
Bid due this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
Questions about groundworks and civil estimating
Volumes come from the existing and proposed levels, not an average depth, and the method is shown in the workbook.
Yes. Runs, chambers and connections are measured from the drainage drawings.
Yes. External works can be a separate section from the building.
Most estimates are delivered in 24 to 48 hours after you approve the fixed fee. The quote comes back within the hour on working days.
As a fixed fee quoted from your drawings before any work starts. There is no hourly billing and no retainer.
An editable Excel workbook with the formulas intact, marked-up PDFs of your drawings and a summary with inclusions and exclusions.
The drawing set, any specification and addenda, and the date you need the figures. A plan-room link works as well as a PDF or DWG upload.
Yes. A second estimator reviews every estimate before it is delivered, and the team includes an RICS-qualified quantity surveyor.
Ready to price your next bid?
Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.