Programme Planning and Critical Path Scheduling in the UK

A construction programme sets out activities, durations and the logic between them. Nova Estimation builds critical path programmes from your drawings and scope, links activities to cost where required and delivers the programme with its assumptions listed, so you can challenge any duration.

  • Fixed fee before work starts
  • Editable Excel and marked-up PDFs
  • Second estimator check
UK

What is a critical path programme?

A critical path programme links activities in the order they must happen, shows which ones control the finish date and highlights where delay would move it.

Linked to cost, it also shows when money is spent, which helps with cash flow and valuation planning.

Detail

What do we need to build one?

The drawings, the scope, any known constraints such as phasing or lead times, and the dates you are working to.

We state every assumption about durations and sequence so you can challenge or adjust them.

Included

What is included?

  • Programme

    Activities, durations and logic.

  • Critical path

    The activities that control the date.

  • Cost link

    Activities tied to cost on request.

  • Assumptions

    Durations and sequence stated.

  • Editable file

    Delivered in the format you need.

  • Fixed fee

    Agreed before work starts.

How it works

How does ordering an estimate work?

You know the fee and the delivery date before we start. No retainers and no hourly billing.

  1. Upload

    Send the drawing set, specs and addenda with your bid date. A plan-room link works too.

    About 2 minutes
  2. Quote

    We review the sheets and confirm scope, fee and delivery date. Nothing starts until you say yes.

    Within the hour
  3. Estimate

    Takeoff in Bluebeam or PlanSwift, priced to your ZIP code, then checked by a second estimator.

    24 to 48 hours
  4. Deliver

    You get the workbook, markups and bid summary, and we answer questions until your bid is in.

    Bid day ready

Bid due this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

FAQ

Questions about programme planning and critical path scheduling

Drawings, scope and any known constraints or dates.

Yes. In a cost-loaded programme each activity carries its cost.

We confirm the format when we quote, based on what you need to use the programme.

Most estimates are delivered in 24 to 48 hours after you approve the fixed fee. The quote comes back within the hour on working days.

As a fixed fee quoted from your drawings before any work starts. There is no hourly billing and no retainer.

An editable Excel workbook with the formulas intact, marked-up PDFs of your drawings and a summary with inclusions and exclusions.

The drawing set, any specification and addenda, and the date you need the figures. A plan-room link works as well as a PDF or DWG upload.

Yes. A second estimator reviews every estimate before it is delivered, and the team includes an RICS-qualified quantity surveyor.

Get a fixed quote

Ready to price your next bid?

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.