CSI Division 26 · MEP
Electrical Estimating
Devices, fixtures, panels and gear counted from the plans and schedules, with conduit and conductor taken off the actual routing rather than straight-line distances.
- EA
- devices, fixtures, panels, gear
- LF
- conduit and conductor by size
- CKT
- branch circuits by panel
- LS
- gear, testing, commissioning
Scope
What we measure.
Measured from
Power and lighting plans, one-line diagrams, panel schedules and fixture schedules
- 01Devices & Boxes
- 02Lighting Fixtures
- 03Panelboards & Gear
- 04Conduit & Fittings
- 05Conductor · Feeder/branch
Where bids go wrong
What other electrical estimates miss.
- 01
Feeder lengths taken from the actual routing, not straight-line distances between panels.
- 02
Fixture types counted from the schedule with controls, drivers and emergency ballast included.
- 03
Equipment connections coordinated from the mechanical and kitchen schedules, not the power plan.
- 04
Labor units applied by system and height — the same device costs more on a 30-foot ceiling.
Sample takeoff
How electrical line items come back.
Every quantity is traceable to the sheet it came from, in the units the trade buys in.
- Quantities traced to the sheet they came from
- Waste and productivity carried as visible lines
- Formulas intact — edit any rate
=ROUND(C4*D4*(1+$E$2),2)| CSI | Line item | Quantity | |
|---|---|---|---|
| 2 | 26 27 26 | Devices & boxes | 186 EA |
| 3 | 26 51 00 | Lighting fixtures | 124 EA |
| 4 | 26 24 16 | Panelboards & gear | 6 EA |
| 5 | 26 05 33 | Conduit & fittings | 3,240 LF |
| 6 | 26 05 19 | Conductor — feeder/branch | 9,600 LF |
FAQ
Electrical Estimating, answered.
Talk to an estimator
Not a salesperson. Same-day answers on working days.
+1 518 974 7222[email protected]Do you measure wire and conduit?
Yes. Conduit and wire are measured by size and type from the plans and one-line diagram, with fittings and supports included.
Are low-voltage systems included?
They are estimated separately under low voltage, fire alarm and access control unless you want them combined.
Can you use our cost book and labor rates?
Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.
How does pricing work?
Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.
Do you sign NDAs?
Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.
Same division
More in MEP.
- CSI 22Plumbing EstimatingFixtures by mark, domestic water and waste and vent by size and material, plus the carriers,…View
- CSI 23HVAC EstimatingEquipment from the schedule and ductwork by the pound with fittings counted, because fittings carry the…View
- CSI 23Mechanical EstimatingHydronic and process piping by size and service with plant equipment, specialities and seismic restraint, and…View
- CSI 21Fire Protection EstimatingHead count driven by hazard classification and ceiling type rather than floor area, with hydraulic calculations,…View
Start a quote
Need electrical numbers for your next bid?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.
