CSI Division 21 · MEP
Fire Protection Estimating
Head count driven by hazard classification and ceiling type rather than floor area, with hydraulic calculations, bracing and the underground lead-in.
- EA
- heads, valves, devices
- LF
- pipe by size
- LS
- calculations, permits, testing
Scope
What we measure.
Measured from
Fire protection plans, reflected ceiling plans, hazard classifications and the sprinkler specification
- 01Sprinkler Heads
- 02Pipe & Fittings
- 03Standpipe & Valves
- 04Fire Pump & Controller
- 05Hangers & Bracing
Where bids go wrong
What other fire protection estimates miss.
- 01
Head count driven by hazard classification and ceiling type, not by floor area alone.
- 02
Hydraulic calculation and shop drawings, which are design work billed before installation.
- 03
Seismic bracing, sleeves and firestopping through every rated assembly.
- 04
Backflow prevention, fire department connections and the underground lead-in.
Sample takeoff
How fire protection line items come back.
Every quantity is traceable to the sheet it came from, in the units the trade buys in.
- Quantities traced to the sheet they came from
- Waste and productivity carried as visible lines
- Formulas intact — edit any rate
=ROUND(C4*D4*(1+$E$2),2)| CSI | Line item | Quantity | |
|---|---|---|---|
| 2 | 21 13 13 | Sprinkler heads | 186 EA |
| 3 | 21 11 00 | Pipe & fittings | 2,180 LF |
| 4 | 21 12 00 | Standpipe & valves | 8 EA |
| 5 | 21 30 00 | Fire pump & controller | 1 EA |
| 6 | 21 05 00 | Hangers & bracing | 1 LS |
FAQ
Fire Protection Estimating, answered.
Talk to an estimator
Not a salesperson. Same-day answers on working days.
+1 518 974 7222[email protected]Do you estimate before hydraulic calculations exist?
Yes. Head counts and pipe are estimated from the hazard classification and ceiling plans, with the design calculations carried as an item.
Are fire pumps included?
Yes. Fire pumps, controllers, standpipes and the fire department connection are measured where the drawings show them.
Can you use our cost book and labor rates?
Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.
How does pricing work?
Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.
Do you sign NDAs?
Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.
Same division
More in MEP.
- CSI 26Electrical EstimatingDevices, fixtures, panels and gear counted from the plans and schedules, with conduit and conductor taken…View
- CSI 22Plumbing EstimatingFixtures by mark, domestic water and waste and vent by size and material, plus the carriers,…View
- CSI 23HVAC EstimatingEquipment from the schedule and ductwork by the pound with fittings counted, because fittings carry the…View
- CSI 23Mechanical EstimatingHydronic and process piping by size and service with plant equipment, specialities and seismic restraint, and…View
Start a quote
Need fire protection numbers for your next bid?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.