Sitework Estimating

Everything outside the building line the architectural set stops short of showing — curbs, walks, pads, fencing, erosion control and final restoration.

Measured inCSI 31
LF
curb, fence, edging
SF
walks, pads, hardscape
AC
restoration and seeding
EA
signs, bollards, site furnishings
Get a fixed quote within the hour

Scope

What we measure.

Measured from

Site plans, civil details and the landscape and hardscape plans

  1. 01Curb & Gutter
  2. 02Sidewalk · 4" Concrete
  3. 03Fencing
  4. 04Pavement Marking & Signs
  5. 05Site Restoration

Where bids go wrong

What other sitework estimates miss.

  1. Everything outside the building line that the architectural set stops short of showing.

  2. Site concrete formwork, jointing and finishing, priced separately from the flatwork area.

  3. Traffic control, phasing and access maintenance on an occupied site.

  4. Final restoration, seeding and the punch-list return visit after the building trades leave.

Sample takeoff

How sitework line items come back.

Every quantity is traceable to the sheet it came from, in the units the trade buys in.

  • Quantities traced to the sheet they came from
  • Waste and productivity carried as visible lines
  • Formulas intact — edit any rate
estimate.xlsxFormulas on
Sitework — sample takeoff
CSILine itemQuantity
32 16 13Curb & gutter1,240 LF
32 16 23Sidewalk — 4" conc.3,180 SF
32 31 13Fencing860 LF
32 17 23Pavement marking & signs1 LS
32 90 00Site restoration1.8 AC
Illustrative structure, not a real project. Every estimate is measured from your own drawings.

FAQ

Sitework Estimating, answered.

Talk to an estimator

Not a salesperson. Same-day answers on working days.

+1 518 974 7222[email protected]
What does sitework include?

Site demolition, clearing, erosion control, site concrete, fencing and site furnishings, each measured as its own scope.

Do you include erosion control?

Yes. Silt fence, inlet protection and construction entrances are measured from the erosion control plan.

Can you use our cost book and labor rates?

Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.

How does pricing work?

Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.

Do you sign NDAs?

Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.

Start a quote

Need sitework numbers for your next bid?

Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.