Skip to content

CSI Division 26 · Specialty Trades

Solar Estimating

Modules, racking, inverters and DC and AC runs, with the roof attachment method, structural review and interconnection that decide whether the array happens at all.

Measured inCSI 26
EA
modules, inverters, optimisers
KW
system capacity, racking
LF
conduit, wire, cable tray
LS
interconnection, permits, commissioning
Get a fixed quote within the hour

Scope

What we measure.

Measured from

PV layout, single-line diagram, racking details and the equipment specifications

  1. 01PV Modules · 450w
  2. 02Racking & Attachment
  3. 03Inverters / Optimizers
  4. 04DC/AC Conduit & Wire
  5. 05Grounding & Bonding

Where bids go wrong

What other solar estimates miss.

  1. Roof attachment and flashing method, which is a roofing warranty question before it is a solar one.

  2. Structural review of the existing roof for the added dead and wind load.

  3. Interconnection, utility application, metering and the point of common coupling.

  4. Rapid shutdown, labelling and the inspection requirements of the local jurisdiction.

Sample takeoff

How solar line items come back.

Every quantity is traceable to the sheet it came from, in the units the trade buys in.

  • Quantities traced to the sheet they came from
  • Waste and productivity carried as visible lines
  • Formulas intact — edit any rate
estimate.xlsxFormulas on
Solar — sample takeoff
CSILine itemQuantity
26 31 00Pv modules — 450w248 EA
26 31 00Racking & attachment111.6 KW
26 31 00Inverters / optimisers6 EA
26 05 33Dc/ac conduit & wire1,860 LF
26 05 26Grounding & bonding1 LS
Illustrative structure, not a real project. Every estimate is measured from your own drawings.

FAQ

Solar Estimating, answered.

Talk to an estimator

Not a salesperson. Same-day answers on working days.

+1 518 974 7222[email protected]
Do you estimate rooftop and ground-mount solar?

Yes. Racking, modules, inverters and balance of system are measured for each mounting type.

Is interconnection included?

Interconnection equipment is measured from the single-line diagram. Utility fees are listed as an exclusion.

Can you use our cost book and labor rates?

Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.

How does pricing work?

Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.

Do you sign NDAs?

Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.

Start a quote

Need solar numbers for your next bid?

Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.