Who we work with
Owners & Investors
An independent number and a plain reading of where the risk sits, with no interest in who wins the job.
- →
- Construction Cost Consulting
- →
- Construction Estimating
- →
- Pre-Construction
For owners & investors
Where the estimate earns its fee.
Owners and investors need someone measuring the work who has no interest in who builds it. We provide independent estimates, review contractor pricing and change orders, and explain in plain terms where the cost and the risk sit in a project.
Not knowing if a bid is fair
An independent measured estimate to compare against.
Change orders without backup
Each change priced from the drawings, with quantities shown.
Capital planning across properties
Repair and improvement budgets you can rank and schedule.
Recommended
Services that fit.
- RecommendedConstruction Cost ConsultingIndependent cost review, budget reconciliation and change order pricing — a second measured opinion when a…View
- RecommendedConstruction EstimatingComplete priced estimates across every CSI division, from a concept budget to a hard bid, structured…View
- RecommendedPre-ConstructionConceptual and schematic budgets before there is a full drawing set, so cost is a design…View
What you receive
Everything you need to bid. Nothing you have to redo.
Every estimate ships as the same four-part package, on the first job and the fiftieth.
=ROUND(C4*D4*(1+$E$2),2)| CSI | Line item | Quantity | |
|---|---|---|---|
| 2 | 03 30 00 | Cast-in-place concrete | 46 CY |
| 3 | 03 20 00 | Reinforcing steel | 0.86 TON |
| 4 | 05 12 00 | Structural steel framing | 38.4 TON |
| 5 | 09 21 16 | Gypsum board assemblies | 18,420 SF |
| 6 | 09 65 19 | LVT flooring | 2,140 SF |
| 7 | 23 31 13 | Ductwork — galvanized | 4,860 LB |
| 8 | 26 05 19 | Building wire & cable | 12,300 LF |
- LVT flooring2,140 SF
- Partition type A412 LF
- Flush wood doors18 EA
- Sheet A-2013 items
Bid summary · Sample
3-story office — base bid
- Bid date
- Thu, 4:00 PM
- Location
- Austin, TX
- Set
- Addendum 2
- 03 Concrete22%
- 05 Metals14%
- 09 Finishes26%
- 22 Plumbing9%
- 23 HVAC17%
- 26 Electrical12%
Alternates and allowances listed separately · Page 1 of 3
Scope letter · Sample
Inclusions, exclusions & RFIs
Included
- Formwork & accessories
- Vapor barrier under slab
- Embeds per S-501
Excluded
- Winter protection
- Testing & inspection
- Dewatering
RFIs
- Slab thickness at grid C-4?
- Door 214 hardware set?
- Roof drain size conflict
How it works
From plan set to bid‑ready in three steps.
No retainer, no subscription and nothing measured until you approve the fee.
- Drop plans hereA-201 Floor plans.pdf12 MBProject manual.pdf4 MBStep 1
Upload your drawings
Plans, specs, addenda and the bid date — PDF, DWG or a plan-room link.
Takes 2 minutes Fixed quote
- Scope
- Div. 03–09
- Delivery
- Thu, 10:00 AM
- Revisions
- Addenda included
Step 2Get a fixed quote
An estimator reviews the scope and confirms the fee and delivery date.
Within the hour- estimate.xlsxbid-summary.pdfmarkup-set.pdfscope-and-rfis.pdfStep 3
Receive a bid-ready package
Live Excel workbook, PDF summary, marked-up plans and written scope.
Usually 24–48 h
FAQ
Questions from owners & investors.
Talk to an estimator
Not a salesperson. Same-day answers on working days.
+1 518 974 7222[email protected]Are you independent of contractors?
Yes. We do not build, and we are not paid by the contractors whose pricing we review.
Can you budget improvements across several properties?
Yes. Each property is estimated separately and rolled into one capital plan.
Will the report make sense to non-builders?
Yes. Every review comes with a plain-language summary of findings and risk.
Can you use our cost book and labor rates?
Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.
How does pricing work?
Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.
Start a quote
Have a bid coming up?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.
