Skip to content

CSI Division 31 · Civil & Sitework

Earthwork Estimating

Cut, fill and export by state, with shrink and swell treated as three different numbers, and haul distance and disposal that usually cost more than the digging.

Measured inCSI 31
CY
cut, fill, export by state
AC
clearing, stripping, seeding
LF
erosion control, silt fence
SF
stabilisation and matting
Get a fixed quote within the hour

Scope

What we measure.

Measured from

Grading plans, existing and proposed surfaces and the geotechnical report

  1. 01Cut · Common
  2. 02Fill & Compaction
  3. 03Export / Haul Off
  4. 04Clear & Grub
  5. 05Erosion Control

Where bids go wrong

What other earthwork estimates miss.

  1. Shrink and swell factors between bank, loose and compacted volumes — three different numbers.

  2. Topsoil strip, stockpile and respread, which is volume handled twice.

  3. Haul distance and disposal fees, which usually cost more than the excavation itself.

  4. Dewatering, undercut and unsuitable material, carried as an allowance with a stated basis.

Sample takeoff

How earthwork line items come back.

Every quantity is traceable to the sheet it came from, in the units the trade buys in.

  • Quantities traced to the sheet they came from
  • Waste and productivity carried as visible lines
  • Formulas intact — edit any rate
estimate.xlsxFormulas on
Earthwork — sample takeoff
CSILine itemQuantity
31 23 16Cut — common4,820 CY
31 23 23Fill & compaction3,140 CY
31 23 19Export / haul off1,680 CY
31 10 00Clear & grub2.4 AC
31 25 00Erosion control1,840 LF
Illustrative structure, not a real project. Every estimate is measured from your own drawings.

FAQ

Earthwork Estimating, answered.

Talk to an estimator

Not a salesperson. Same-day answers on working days.

+1 518 974 7222[email protected]
Do you calculate cut and fill from surfaces?

Yes. Volumes are calculated from existing and proposed surfaces, with shrink, swell and topsoil stripping stated as factors.

Is import or export included?

Yes. After balancing, net import or export and haul quantities are listed.

Can you use our cost book and labor rates?

Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.

How does pricing work?

Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.

Do you sign NDAs?

Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.

Start a quote

Need earthwork numbers for your next bid?

Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.