CSI Division 04 · Structural

Masonry Estimating

CMU, brick, stone and veneer counted by wall area and unit type, with grout volume taken from the cells that are really grouted rather than the elevation count.

Measured inCSI 04
SF
wall area by unit type
CY
grout volume
LF
joint reinforcing, flashing, control joints
EA
lintels, bearing plates, anchors
MSF
brick per thousand
Get a fixed quote within the hour

Scope

What we measure.

Measured from

Elevations, wall sections, masonry details and the structural grout and reinforcing schedule

  1. 01CMU · 8" Loadbearing
  2. 02Face Brick Veneer
  3. 03Grout · Solid Cells
  4. 04Joint Reinforcing
  5. 05Lintels & Bearing Plates

Where bids go wrong

What other masonry estimates miss.

  1. Which cells are actually grouted — the structural notes rarely match the elevation count.

  2. Scaffolding and mast climbers, priced by wall height and duration rather than by area.

  3. Cold-weather and hot-weather protection where the schedule puts the wall in the wrong season.

  4. Cavity flashing, weeps, cavity drainage and air barrier tie-ins at every horizontal break.

Sample takeoff

How masonry line items come back.

Every quantity is traceable to the sheet it came from, in the units the trade buys in.

  • Quantities traced to the sheet they came from
  • Waste and productivity carried as visible lines
  • Formulas intact — edit any rate
estimate.xlsxFormulas on
Masonry — sample takeoff
CSILine itemQuantity
04 22 00Cmu — 8" loadbearing3,180 SF
04 21 00Face brick veneer1,240 SF
04 05 16Grout — solid cells31 CY
04 05 23Joint reinforcing2,960 LF
05 50 00Lintels & bearing pl.42 EA
Illustrative structure, not a real project. Every estimate is measured from your own drawings.

FAQ

Masonry Estimating, answered.

Talk to an estimator

Not a salesperson. Same-day answers on working days.

+1 518 974 7222[email protected]
Do you count block or measure by area?

Both. Wall area is measured net of openings, then converted to unit counts by block size with bond beams, lintels and grouted cells broken out.

Are grout and reinforcing included?

Yes. Grouted cells, horizontal joint reinforcing and vertical bars are measured from the structural schedule.

Can you use our cost book and labor rates?

Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.

How does pricing work?

Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.

Do you sign NDAs?

Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.

Start a quote

Need masonry numbers for your next bid?

Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.