Paving Estimating

Asphalt by tonnage from area, thickness and mix density, with base, subgrade preparation, joints and the tie-ins to existing pavement.

Measured inCSI 32
TON
asphalt by mix and course
SY
paved area
CY
aggregate base
LF
curb, joints, edge
Get a fixed quote within the hour

Scope

What we measure.

Measured from

Paving plans, pavement sections, striping plans and curb details

  1. 01Asphalt · Binder Course
  2. 02Asphalt · Surface Course
  3. 03Aggregate Base
  4. 04Concrete Paving
  5. 05Striping & Markings

Where bids go wrong

What other paving estimates miss.

  1. Asphalt by tonnage from area, thickness and mix density, not by square yard alone.

  2. Subgrade preparation and proof-rolling before any base can be placed.

  3. Tack coat, joints, transitions and tie-ins to existing pavement.

  4. Phasing and night work where the lot has to stay open during construction.

Sample takeoff

How paving line items come back.

Every quantity is traceable to the sheet it came from, in the units the trade buys in.

  • Quantities traced to the sheet they came from
  • Waste and productivity carried as visible lines
  • Formulas intact — edit any rate
estimate.xlsxFormulas on
Paving — sample takeoff
CSILine itemQuantity
32 12 16Asphalt — binder course780 T
32 12 16Asphalt — surface course420 T
32 11 23Aggregate base1,240 CY
32 13 13Concrete paving2,180 SF
32 17 23Striping & markings1 LS
Illustrative structure, not a real project. Every estimate is measured from your own drawings.

FAQ

Paving Estimating, answered.

Talk to an estimator

Not a salesperson. Same-day answers on working days.

+1 518 974 7222[email protected]
Do you measure base and sub-base?

Yes. Each layer of the pavement section is measured by area and converted to tons or cubic yards.

Is striping included?

Yes. Striping, symbols and signage are measured from the striping plan.

Can you use our cost book and labor rates?

Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.

How does pricing work?

Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.

Do you sign NDAs?

Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.

Start a quote

Need paving numbers for your next bid?

Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.