CSI Division 22 · MEP
Plumbing Estimating
Fixtures by mark, domestic water and waste and vent by size and material, plus the carriers, trim, hangers and firestopping that sit inside the allowance too often.
- EA
- fixtures, valves, equipment
- LF
- pipe by size, material and service
- LS
- testing, sterilization, start-up
Scope
What we measure.
Measured from
Plumbing plans, riser diagrams, fixture schedules and the plumbing specification
- 01Fixtures By Mark
- 02Domestic Water Pipe
- 03Waste & Vent Pipe
- 04Valves & Specialties
- 05Water Heaters & Equipment
Where bids go wrong
What other plumbing estimates miss.
- 01
Fixture carriers, trim and stops, which are counted per fixture and often left in the allowance.
- 02
Pipe by size and material separately — the same run in copper and PEX are different bids.
- 03
Hangers, sleeves, firestopping and insulation on every run through a rated assembly.
- 04
Excavation, bedding and backfill for underslab work, which belongs to this trade on most jobs.
Sample takeoff
How plumbing line items come back.
Every quantity is traceable to the sheet it came from, in the units the trade buys in.
- Quantities traced to the sheet they came from
- Waste and productivity carried as visible lines
- Formulas intact — edit any rate
=ROUND(C4*D4*(1+$E$2),2)| CSI | Line item | Quantity | |
|---|---|---|---|
| 2 | 22 42 00 | Fixtures by mark | 48 EA |
| 3 | 22 11 16 | Domestic water pipe | 1,860 LF |
| 4 | 22 13 16 | Waste & vent pipe | 1,420 LF |
| 5 | 22 05 23 | Valves & specialties | 86 EA |
| 6 | 22 33 00 | Water heaters & equip. | 4 EA |
FAQ
Plumbing Estimating, answered.
Talk to an estimator
Not a salesperson. Same-day answers on working days.
+1 518 974 7222[email protected]Do you count fixtures and measure pipe?
Yes. Fixtures are counted from the schedule, and pipe is measured by size and material for each system.
Is underground plumbing included?
Yes. Under-slab sanitary and water are measured separately from above-ground work.
Can you use our cost book and labor rates?
Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.
How does pricing work?
Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.
Do you sign NDAs?
Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.
Same division
More in MEP.
- CSI 26Electrical EstimatingDevices, fixtures, panels and gear counted from the plans and schedules, with conduit and conductor taken…View
- CSI 23HVAC EstimatingEquipment from the schedule and ductwork by the pound with fittings counted, because fittings carry the…View
- CSI 23Mechanical EstimatingHydronic and process piping by size and service with plant equipment, specialities and seismic restraint, and…View
- CSI 21Fire Protection EstimatingHead count driven by hazard classification and ceiling type rather than floor area, with hydraulic calculations,…View
Start a quote
Need plumbing numbers for your next bid?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.