CSI Division 23 · MEP

HVAC Estimating

Equipment from the schedule and ductwork by the pound with fittings counted, because fittings carry the fabrication hours — plus controls, insulation and balancing.

Measured inCSI 23
LB
sheet metal by gauge
EA
equipment, boxes, diffusers
LF
round duct, piping, linesets
CFM
air volume by zone
Get a fixed quote within the hour

Scope

What we measure.

Measured from

Mechanical plans, equipment schedules, duct details and the controls sequence

  1. 01Rooftop Units
  2. 02Ductwork · Galvanized
  3. 03Diffusers & Grilles
  4. 04VAV Boxes
  5. 05Duct Insulation

Where bids go wrong

What other HVAC estimates miss.

  1. Ductwork by weight and gauge, with fittings counted — fittings carry the fabrication hours.

  2. Curbs, hangers, vibration isolation and structural support for rooftop equipment.

  3. Controls, wiring and integration boundaries between the mechanical and electrical scopes.

  4. Test, adjust and balance, and the commissioning the specification requires before handover.

Sample takeoff

How HVAC line items come back.

Every quantity is traceable to the sheet it came from, in the units the trade buys in.

  • Quantities traced to the sheet they came from
  • Waste and productivity carried as visible lines
  • Formulas intact — edit any rate
estimate.xlsxFormulas on
HVAC — sample takeoff
CSILine itemQuantity
23 74 00Rooftop units3 EA
23 31 13Ductwork — galv.4,860 LB
23 37 13Diffusers & grilles68 EA
23 36 00VAV boxes18 EA
23 07 13Duct insulation2,140 SF
Illustrative structure, not a real project. Every estimate is measured from your own drawings.

FAQ

HVAC Estimating, answered.

Talk to an estimator

Not a salesperson. Same-day answers on working days.

+1 518 974 7222[email protected]
Do you measure ductwork by weight?

Yes. Duct is measured by gauge and converted to pounds, with fittings counted, because fittings carry the fabrication hours.

Are controls and balancing included?

Yes. Controls, test-and-balance and commissioning are measured as separate lines when the specification requires them.

Can you use our cost book and labor rates?

Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.

How does pricing work?

Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.

Do you sign NDAs?

Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.

Start a quote

Need HVAC numbers for your next bid?

Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.