CSI Division 03 · Structural
Concrete Estimating
Footings, slabs, walls and flatwork quantified to the cubic yard, with formwork carried as contact area rather than slab area — which is where the labor actually sits.
- CY
- placed volume
- SF
- formwork contact area, flatwork, finishes
- LF
- edge form, joints, keyways
- TON
- reinforcing steel
- EA
- embeds, anchor bolts, sleeves
Scope
What we measure.
Measured from
Foundation plans, structural sections, slab plans and the concrete specification
- 01Cast-in-place Concrete
- 02Formwork · Walls
- 03Reinforcing Steel
- 04Flatwork Finish
- 05Joints & Accessories
Where bids go wrong
What other concrete estimates miss.
- 01
Formwork counted as area of contact, not slab area — vertical faces are where the labor sits.
- 02
Waste and over-excavation on footings poured against earth rather than to neat line.
- 03
Embeds, anchor bolts and sleeves coordinated from the structural and MEP sets, not just the foundation plan.
- 04
Curing, sealing and joint filling, which are separate line items and separate crews.
Sample takeoff
How concrete line items come back.
Every quantity is traceable to the sheet it came from, in the units the trade buys in.
- Quantities traced to the sheet they came from
- Waste and productivity carried as visible lines
- Formulas intact — edit any rate
=ROUND(C4*D4*(1+$E$2),2)| CSI | Line item | Quantity | |
|---|---|---|---|
| 2 | 03 30 00 | Cast-in-place conc. | 46 CY |
| 3 | 03 10 00 | Formwork — walls | 310 SF |
| 4 | 03 20 00 | Reinforcing steel | 0.86 T |
| 5 | 03 35 00 | Flatwork finish | 2,140 SF |
| 6 | 03 15 00 | Joints & accessories | 186 LF |
FAQ
Concrete Estimating, answered.
Talk to an estimator
Not a salesperson. Same-day answers on working days.
+1 518 974 7222[email protected]Do you separate concrete by strength and placement method?
Yes. Concrete is broken out by mix, by element and by placement method, such as pump or direct chute, because each carries a different cost.
Is rebar included in a concrete takeoff?
It can be measured by weight alongside the concrete, or delivered separately if rebar is a different subcontract.
Can you use our cost book and labor rates?
Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.
How does pricing work?
Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.
Do you sign NDAs?
Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.
Same division
More in Structural.
- CSI 04Masonry EstimatingCMU, brick, stone and veneer counted by wall area and unit type, with grout volume taken…View
- CSI 05Structural Steel EstimatingFabricated tonnage by shape and grade, plus the connection material, metal deck and erection hours that…View
- CSI 06Framing EstimatingWall length by height and stud spacing, joists, trusses and sheathing — with the headers, blocking…View
- CSI 06Carpentry EstimatingRough and finish carpentry by the linear foot, including the blocking and backing every later trade…View
Start a quote
Need concrete numbers for your next bid?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.
