Skip to content

CSI Division 06 · Structural

Framing Estimating

Wall length by height and stud spacing, joists, trusses and sheathing — with the headers, blocking and hold-downs that get built but rarely appear on the framing plan.

Measured inCSI 06
LF
wall length by height and stud spacing
SF
sheathing, subfloor, deck
BF
board feet of dimensional lumber
EA
trusses, hangers, hold-downs
Get a fixed quote within the hour

Scope

What we measure.

Measured from

Floor plans, framing plans, wall sections, shear wall schedules and truss layouts

  1. 01Stud Walls · 2x6
  2. 02Floor Joists / I-joist
  3. 03Roof Trusses
  4. 04Sheathing · Wall/roof
  5. 05Hangers & Connectors

Where bids go wrong

What other framing estimates miss.

  1. Blocking, backing and fire-stopping, which never appear on the framing plan but always get built.

  2. Headers, king and jack studs at every opening, counted per opening rather than per wall.

  3. Hold-downs, straps and shear-wall nailing from the structural notes, not the architectural plan.

  4. Waste on plate stock, studs cut to non-standard heights, and pick-up carpentry after other trades.

Sample takeoff

How framing line items come back.

Every quantity is traceable to the sheet it came from, in the units the trade buys in.

  • Quantities traced to the sheet they came from
  • Waste and productivity carried as visible lines
  • Formulas intact — edit any rate
estimate.xlsxFormulas on
Framing — sample takeoff
CSILine itemQuantity
06 11 00Stud walls — 2x61,860 LF
06 11 10Floor joists / i-joist4,120 SF
06 17 53Roof trusses46 EA
06 16 00Sheathing — wall/roof7,340 SF
06 05 23Hangers & connectors1 LS
Illustrative structure, not a real project. Every estimate is measured from your own drawings.

FAQ

Framing Estimating, answered.

Talk to an estimator

Not a salesperson. Same-day answers on working days.

+1 518 974 7222[email protected]
Do you produce a lumber list?

Yes. Studs, plates, headers, joists and sheathing are measured member by member and listed by size and length.

Are hardware and fasteners included?

Hold-downs, hangers and straps are counted from the structural details. Nails and screws are carried as an allowance.

Can you use our cost book and labor rates?

Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.

How does pricing work?

Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.

Do you sign NDAs?

Yes. Drawings, specifications and pricing are treated as confidential by default, and we sign your NDA on request before any documents change hands.

Start a quote

Need framing numbers for your next bid?

Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.