Specialized Services
CPM Scheduling
Critical path schedules built against the estimate, so sequence, duration and cost are answering the same set of drawings.
- Turnaround
- Agreed per project
- Delivered as
- Excel · PDF · marked-up plans
- Pricing
- Fixed fee, quoted up front
- Quality
- Second-estimator review
Overview
What this service does.
A schedule and an estimate built from different assumptions will disagree eventually. We build critical-path schedules from the same quantities as the estimate, so durations reflect real production rates and the schedule can be cost-loaded for pay applications and cash-flow forecasting.
Who it’s for
- Contractors needing baseline schedules
- Owners requiring cost-loaded schedules
- Projects with schedule specifications
What’s included
- Baseline CPM schedule
- Durations from measured quantities and production rates
- Cost-loading for pay applications
- Schedule updates and look-aheads
- Delivery in Primavera P6 or Microsoft Project
What you receive
Everything you need to bid. Nothing you have to redo.
Every estimate ships as the same four-part package, on the first job and the fiftieth.
=ROUND(C4*D4*(1+$E$2),2)| CSI | Line item | Quantity | |
|---|---|---|---|
| 2 | 03 30 00 | Cast-in-place concrete | 46 CY |
| 3 | 03 20 00 | Reinforcing steel | 0.86 TON |
| 4 | 05 12 00 | Structural steel framing | 38.4 TON |
| 5 | 09 21 16 | Gypsum board assemblies | 18,420 SF |
| 6 | 09 65 19 | LVT flooring | 2,140 SF |
| 7 | 23 31 13 | Ductwork — galvanized | 4,860 LB |
| 8 | 26 05 19 | Building wire & cable | 12,300 LF |
- LVT flooring2,140 SF
- Partition type A412 LF
- Flush wood doors18 EA
- Sheet A-2013 items
Bid summary · Sample
3-story office — base bid
- Bid date
- Thu, 4:00 PM
- Location
- Austin, TX
- Set
- Addendum 2
- 03 Concrete22%
- 05 Metals14%
- 09 Finishes26%
- 22 Plumbing9%
- 23 HVAC17%
- 26 Electrical12%
Alternates and allowances listed separately · Page 1 of 3
Scope letter · Sample
Inclusions, exclusions & RFIs
Included
- Formwork & accessories
- Vapor barrier under slab
- Embeds per S-501
Excluded
- Winter protection
- Testing & inspection
- Dewatering
RFIs
- Slab thickness at grid C-4?
- Door 214 hardware set?
- Roof drain size conflict
How it works
From plan set to bid‑ready in three steps.
No retainer, no subscription and nothing measured until you approve the fee.
- Drop plans hereA-201 Floor plans.pdf12 MBProject manual.pdf4 MBStep 1
Upload your drawings
Plans, specs, addenda and the bid date — PDF, DWG or a plan-room link.
Takes 2 minutes Fixed quote
- Scope
- Div. 03–09
- Delivery
- Thu, 10:00 AM
- Revisions
- Addenda included
Step 2Get a fixed quote
An estimator reviews the scope and confirms the fee and delivery date.
Within the hour- estimate.xlsxbid-summary.pdfmarkup-set.pdfscope-and-rfis.pdfStep 3
Receive a bid-ready package
Live Excel workbook, PDF summary, marked-up plans and written scope.
Usually 24–48 h
FAQ
CPM Scheduling, answered.
Talk to an estimator
Not a salesperson. Same-day answers on working days.
+1 518 974 7222[email protected]Which scheduling software do you use?
Primavera P6 and Microsoft Project. We deliver native files plus PDF Gantt charts.
Can you cost-load an existing schedule?
Yes. We map your activities to the estimate and load the cost, then flag activities with no cost or cost with no activity.
Do you provide monthly updates?
Yes, on a monthly or per-pay-application basis, including progress, a critical-path review and a narrative.
Can you use our cost book and labor rates?
Yes, and we prefer it. Your historical costs reflect your crews and your suppliers better than any published average. Send the template and we work inside it.
How does pricing work?
Pricing is per project and quoted before any work starts — no retainer, no minimum volume and no subscription.
Start a quote
Have a bid coming up?
Pick your project type and send the drawings. We confirm the fee and delivery date within the hour on working days.