CSI Divisions Explained
CSI divisions are the numbered groups of the MasterFormat system, published by the Construction Specifications Institute, used to organize construction specifications and estimates. Each division covers one area of work, such as 03 Concrete or 26 Electrical, so every project's scope, cost and documents can be filed and compared in the same order.
Last updated
What are the main CSI divisions?
Divisions 15 to 20, 29, 30 and 36 to 39 are reserved, and higher numbers cover process and industrial work.
| Division | Covers |
|---|---|
| 01 | General requirements |
| 02 | Existing conditions |
| 03 | Concrete |
| 04 | Masonry |
| 05 | Metals |
| 06 | Wood, plastics and composites |
| 07 | Thermal and moisture protection |
| 08 | Openings |
| 09 | Finishes |
| 10 to 14 | Specialties, equipment, furnishings, special construction, conveying |
| 21 to 28 | Fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electronic safety and security |
| 31 to 35 | Earthwork, exterior improvements, utilities, transportation, waterway |
Why are estimates organized by CSI division?
Organizing an estimate by division makes it easy to compare with the specifications, with subcontractor quotes and with other projects. It also makes gaps visible: if a division has no cost, either it is not in the project or it has been missed.
How do CSI section numbers work?
Each division is broken into sections with six-digit numbers. For example, 09 21 16 is gypsum board assemblies within division 09 Finishes. Estimates often use these section numbers as cost codes.
What is the difference between MasterFormat and UniFormat?
MasterFormat organizes work by material and trade, which suits bid estimates. UniFormat organizes cost by building element, such as foundations or exterior walls, which suits early design-stage estimates.
Bid due this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
Frequently asked questions
MasterFormat has 50 division numbers, from 00 to 49, but several are reserved for future use.
Division 23, Heating, Ventilating and Air Conditioning.
Division 26, Electrical. Communications are division 27 and electronic safety and security division 28.
Most commercial bid estimates do. Residential and early budgets sometimes use simpler or elemental formats.
MasterFormat organizes work by trade and material, while UniFormat organizes it by building system. Estimators often use both.
No. A project uses only the divisions its drawings contain, and the rest are left out of the estimate.
Which trade groups do we estimate?
-
Structural
The frame and everything that carries load โ concrete, masonry, steel and carpentry.
-
Architectural
The envelope and the finishes โ roofing, cladding, openings, partitions and surfaces.
-
MEP
Mechanical, electrical and plumbing, each measured the way its own trade bids it.
-
Civil & Sitework
Everything outside the building line โ earthwork, utilities, paving and landscape.
-
Specialty Trades
Scopes that sit outside the main divisions and are routinely missed in a bid.
Ready to price your next bid?
Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.