Paving Estimating Services
Paving estimating measures every pavement area on a site and prices each layer of the pavement section, from subgrade preparation to surface course. Nova Estimation takes off asphalt and concrete paving by section, converts layers to tons and cubic yards, and counts curbs, striping and signage in a paving estimate.
- CSI Division 32 Exterior Improvements
- 24 to 48 hour delivery
- Excel + marked-up PDFs
Why do paving bids go wrong?
-
Area is not the whole price
Pavement thickness, base depth and subgrade prep drive tonnage and cost, and a flat area rate misses them.
-
Striping and curbs are forgotten
Curbs, gutters, ADA ramps and striping add real cost and often appear on separate sheets.
-
Material prices move
Asphalt tonnage and concrete yardage need current supplier prices, not last season's numbers.
What do we measure in a paving takeoff?
Every paving item is measured from your sheets and carried in the units your crews and suppliers price in.
- Asphalt · Binder Course
- Asphalt · Surface Course
- Aggregate Base
- Concrete Paving
- Striping & Markings
How is a paving estimate priced?
Pavement is priced layer by layer. We measure each pavement section by area, then convert subbase to cubic yards and asphalt courses to tons using the specified thickness and density.
Curbs and gutters are measured by type and length, and striping, stalls, arrows and signage are counted from the striping plan. Concrete paving, sidewalks and dumpster pads are measured by thickness and area.
What do our estimators check on a paving set?
We measure each pavement area from the site plan and apply the section detail for thickness and base depth. Asphalt is converted to tons and concrete to cubic yards.
Curbs, gutters, ramps and wheel stops are measured or counted from the details, and striping is measured by length and count. Subgrade prep and geotextile come from the geotechnical recommendations.
What do paving bids usually miss?
These are the items we check on every set, because they are where bids lose money.
- 01
Asphalt by tonnage from area, thickness and mix density, not by square yard alone.
- 02
Subgrade preparation and proof-rolling before any base can be placed.
- 03
Tack coat, joints, transitions and tie-ins to existing pavement.
- 04
Phasing and night work where the lot has to stay open during construction.
What does a paving estimate look like?
Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.
| CSI | Item | Quantity |
|---|---|---|
| 32 12 16 | Asphalt, binder course | 780 T |
| 32 12 16 | Asphalt, surface course | 420 T |
| 32 11 23 | Aggregate base | 1,240 CY |
| 32 13 13 | Concrete paving | 2,180 SF |
| 32 17 23 | Striping & markings | 1 LS |
Illustrative structure only. Your estimate is measured from your own drawings.
What kinds of paving projects do we estimate?
We estimate paving for parking lots, roads, drive aisles, loading areas and sidewalks. Each estimate shows pavement by section, base depth and thickness, so changing one section does not rework the whole takeoff.
Why use Nova Estimation for paving estimating?
-
Tons and yards by section
Each pavement section is measured by area and thickness, then converted to tons or cubic yards.
-
Curbs, ramps and striping counted
Curbs, gutters, ramps and striping are measured by length or count.
-
Base and subgrade listed
Aggregate base, geotextile and subgrade prep appear as separate lines.
Who orders a paving estimate?
- 01
Paving contractors pricing asphalt and concrete scopes
- 02
Site contractors comparing paving bids
- 03
Owners budgeting parking lot repairs
What should you send for a paving estimate?
These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.
- Civil site and paving plans
- Pavement section details
- Geotechnical report and pavement recommendations
- Striping and signage plans
- Paving specification sections
- Addenda and bid forms
How do you order a paving estimate?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the civil plans, paving details, pavement sections and the specification.
About 2 minutesQuote
We confirm asphalt or concrete, base requirements and whether curbs and striping are included.
Within the hourEstimate
Pavement is measured by section and thickness, then converted to tons or yards.
24 to 48 hoursDeliver
You receive the workbook, marked-up site plans and a summary by pavement type.
Bid day ready
Bidding paving this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does a paving estimate cost?
A paving estimate is a fixed fee that depends on the number of site sheets, the number of pavement sections and whether curbs, ramps and striping are included.
A single parking lot is faster than a campus with several pavement types. The quote arrives free, usually within the hour on working days.
Paving estimating questions
By multiplying area by the specified thickness and the asphalt density, for each course separately.
Yes. Proof rolling, stabilization and base course are measured with each pavement section.
Yes, from the striping and signage plan, by type and length or count.
Yes. Concrete paving, sidewalks and pads are measured by thickness, area and reinforcement.
Yes. Milling depth and overlay thickness are measured by area for resurfacing projects.
The fee is fixed per project and quoted free within the hour on working days, with no retainer and no minimum.
Most paving estimates arrive in 24 to 48 hours from approval.
Striping, curbs and walks shown on the plans are measured and listed separately.
The site plan, grading plan and paving details with the pavement sections.
More civil & sitework trades we estimate
Get a fixed quote for your paving takeoff
Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.