Fire Protection Estimating Services
Fire protection estimating counts sprinkler heads and measures the mains, branch lines, risers and standpipes of a fire suppression system. Nova Estimation takes off fire protection drawings or prices from design criteria and hazard classification when only a performance specification exists, delivering a fire sprinkler estimate in 24 to 48 hours.
- CSI Division 21 Fire Suppression
- 24 to 48 hour delivery
- Excel + marked-up PDFs
Why do fire protection bids go wrong?
-
Heads are counted, pipe is guessed
Sprinkler heads are visible on the plan, but main, branch lines and fittings need hydraulic judgment.
-
Hazard classes change the layout
Light, ordinary and extra hazard areas differ in density and spacing, and a flat rate per square foot misses the change.
-
Underground feeds are scoped late
Fire service mains, backflow preventers and hydrants are often assigned to another trade at the last minute.
What do we measure in a fire protection takeoff?
Every fire protection item is measured from your sheets and carried in the units your crews and suppliers price in.
- Sprinkler Heads
- Pipe & Fittings
- Standpipe & Valves
- Fire Pump & Controller
- Hangers & Bracing
How is a fire protection estimate priced?
When fire protection drawings exist, we count heads by type and measure mains and branch lines by size. When the design is delegated to the sprinkler contractor, we price from the hazard classification and area, using head spacing and typical pipe density, and state the basis clearly.
Risers, standpipes, fire department connections, valves and backflow preventers are counted separately. Fire pumps and special suppression systems are listed as their own lines or allowances.
What do our estimators check on a fire protection set?
We measure sprinkler layout area by hazard class and count heads at the specified spacing. Branch lines, cross mains and risers are measured by pipe size from the plans and riser diagram.
Fittings, hangers and seismic bracing are added, and underground mains, backflow preventers and fire pumps are listed as separate equipment. Hydraulic assumptions are stated, since design-build systems depend on them.
What do fire protection bids usually miss?
These are the items we check on every set, because they are where bids lose money.
- 01
Head count driven by hazard classification and ceiling type, not by floor area alone.
- 02
Hydraulic calculation and shop drawings, which are design work billed before installation.
- 03
Seismic bracing, sleeves and firestopping through every rated assembly.
- 04
Backflow prevention, fire department connections and the underground lead-in.
What does a fire protection estimate look like?
Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.
| CSI | Item | Quantity |
|---|---|---|
| 21 13 13 | Sprinkler heads | 186 EA |
| 21 11 00 | Pipe & fittings | 2,180 LF |
| 21 12 00 | Standpipe & valves | 8 EA |
| 21 30 00 | Fire pump & controller | 1 EA |
| 21 05 00 | Hangers & bracing | 1 LS |
Illustrative structure only. Your estimate is measured from your own drawings.
What kinds of fire protection projects do we estimate?
We estimate sprinkler and standpipe systems for offices, retail, apartments, warehouses and healthcare buildings. Each estimate lists heads, pipe by size, fittings, hangers and equipment, grouped by area and hazard class.
Why use Nova Estimation for fire protection estimating?
-
Heads and pipe measured
Sprinklers, branch lines and mains are counted from the plans and sized by hazard class.
-
Fittings and hangers included
Fittings, hangers and seismic bracing are listed with the pipe.
-
Underground and risers separate
Fire service, risers, standpipes and backflow devices are separate lines.
Who orders a fire protection estimate?
- 01
Fire protection contractors pricing sprinkler and standpipe systems
- 02
General contractors comparing fire protection bids
- 03
Owners checking code-driven scope
What should you send for a fire protection estimate?
These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.
- Fire protection plans, all floors
- Riser and standpipe diagrams
- Hazard classification and code notes
- Fire protection specification sections
- Addenda and bid forms
- Existing system information for renovations
How do you order a fire protection estimate?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the sprinkler plans, riser diagrams, hazard classifications, details and the specification.
About 2 minutesQuote
We confirm hazard classes, whether underground work is included and any design-build responsibility.
Within the hourEstimate
Heads, pipe, fittings and hangers are measured by area and hazard class.
24 to 48 hoursDeliver
You receive the workbook, marked-up plans and a summary by area and system.
Bid day ready
Bidding fire protection this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does a fire protection estimate cost?
A fire protection estimate is a fixed fee that depends on the number of sprinkler sheets, the number of hazard areas and whether underground, standpipes and pumps are included.
A simple office floor is quicker than a warehouse with in-rack protection. Send the plans and the fee arrives free, usually within the hour on working days.
Fire Protection estimating questions
Yes. When the design is delegated, we price from the hazard classification and floor area, with the method and assumptions stated.
Yes. Pendent, upright, sidewall and concealed heads are counted separately where drawn.
Yes. Standpipes, hose valves and fire department connections are counted from the drawings.
Fire pumps are listed separately and usually priced as an allowance or vendor quote.
Fire alarm is a separate trade and is estimated under our fire alarm service.
The fee is fixed per project and quoted free within the hour on working days, with no retainer and no minimum.
Most are delivered in 24 to 48 hours from approval.
Yes. Pumps, tanks and backflow devices are listed as separate equipment lines.
Yes. Where the design is delegated, we list our assumptions about layout and hazard class.