Concrete Estimating Services
Concrete estimating measures every footing, wall, slab and deck in a drawing set and prices the concrete, reinforcing, formwork and finishing behind it. Nova Estimation takes off concrete by element in cubic yards, carries forms by contact area and rebar by weight, and delivers an editable estimate in 24 to 48 hours.
- CSI Division 03 Concrete
- 24 to 48 hour delivery
- Excel + marked-up PDFs
Why do concrete bids go wrong?
-
The yards do not match the pour
Slab thickness, thickened edges and haunches add yards that a quick area times depth misses. Short orders mean cold joints and a second truck.
-
Formwork is priced as an afterthought
Contact area drives forming labor, and it changes with every wall height and column size. Bids that lump it in lose money on forming-heavy jobs.
-
Addenda change the structure late
A revised footing schedule or slab thickness arrives two days before bid day, and the old quantities stay in the spreadsheet.
What do we measure in a concrete takeoff?
Every concrete item is measured from your sheets and carried in the units your crews and suppliers price in.
- Cast-in-place Concrete
- Formwork · Walls
- Reinforcing Steel
- Flatwork Finish
- Joints & Accessories
How is a concrete estimate priced?
Concrete is priced in three parts that move independently: the concrete itself by cubic yard, formwork by contact area and reinforcing by weight. We measure each element separately so a change to wall height or slab thickness can be repriced without starting again.
Placement and finishing are where labor cost hides. Pump time, placement method, finish type and curing are carried as their own lines, and waste is applied by element type rather than as one percentage across the job.
What do our estimators check on a concrete set?
We start with the foundation plan and sections, because footing depth, thickened slab edges and pits change yardage the most. Slabs are measured from the structural plan, then checked against the architectural sheets for depressions, curbs and equipment pads that the structural set may leave out.
Walls and columns are taken off by height and thickness, with forms measured on both faces. We confirm the concrete strength and finish in the specification, check the reinforcing notes for lap and cover requirements, and list pump, placement and finishing as their own lines. Addenda are applied before the workbook is closed.
What do concrete bids usually miss?
These are the items we check on every set, because they are where bids lose money.
- 01
Formwork counted as area of contact, not slab area, vertical faces are where the labor sits.
- 02
Waste and over-excavation on footings poured against earth rather than to neat line.
- 03
Embeds, anchor bolts and sleeves coordinated from the structural and MEP sets, not just the foundation plan.
- 04
Curing, sealing and joint filling, which are separate line items and separate crews.
What does a concrete estimate look like?
Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.
| CSI | Item | Quantity |
|---|---|---|
| 03 30 00 | Cast-in-place conc. | 46 CY |
| 03 10 00 | Formwork, walls | 310 SF |
| 03 20 00 | Reinforcing steel | 0.86 T |
| 03 35 00 | Flatwork finish | 2,140 SF |
| 03 15 00 | Joints & accessories | 186 LF |
Illustrative structure only. Your estimate is measured from your own drawings.
What kinds of concrete projects do we estimate?
We estimate concrete for slabs and foundations, tilt-up and cast-in-place frames, parking structures and site concrete. Each estimate shows yards by element, formwork by contact area and reinforcing by weight, so a change to one element does not reopen the whole takeoff.
Why use Nova Estimation for concrete estimating?
-
Element by element takeoff
Footings, walls, columns, slabs and decks each get their own lines, so a revision reprices one element, not the whole job.
-
Forms and rebar tied to the pour
Contact area and reinforcing are measured from the same sheets, so the three quantities always agree.
-
A second estimator checks the yards
Totals are reconciled against the sections and details before the workbook leaves our desk.
Who orders a concrete estimate?
- 01
Concrete subcontractors pricing a foundation or flatwork package
- 02
General contractors carrying concrete as a self-perform scope
- 03
Developers checking a concrete budget before the bid goes out
What should you send for a concrete estimate?
These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.
- Structural drawings, foundation and framing plans
- Architectural sections that show slabs and finishes
- Geotechnical report
- Concrete specification sections
- Addenda and bid forms
- Supplier quotes or mix designs if you hold them
How do you order a concrete estimate?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the structural set, the architectural sheets that show slabs and the geotechnical notes.
About 2 minutesQuote
We confirm whether rebar, forms and finishing are in scope and send a fixed fee and date.
Within the hourEstimate
Concrete is taken off by element in cubic yards, forms by contact area, then priced to your ZIP code.
24 to 48 hoursDeliver
You receive the Excel workbook with marked-up PDFs showing every element counted.
Bid day ready
Bidding concrete this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does a concrete estimate cost?
The fee for a concrete estimate is fixed before work starts and depends on the number of structural sheets, how many different elements the set contains, and whether rebar, formwork and finishing are included or ordered separately.
A single-story slab and footing job is quoted differently from a multi-level cast-in-place frame. Send the plans and you receive the exact figure, free of charge, within the hour on working days.
Concrete estimating questions
Yes. Reinforcing is measured by bar size and weight from the structural drawings, including laps and accessories. It can also be ordered as a separate rebar takeoff.
Formwork is measured by contact area for each element type, because forming a wall, a column and an edge all cost differently per square foot.
By element: footings, grade beams, walls, columns, slabs on grade, elevated decks and toppings each have their own line, so you can see where the yards go.
Pump time and placement method are carried as separate lines, based on the element and access shown on the drawings.
We measure the concrete, forms and mild steel for post-tensioned decks. The tendon package is usually a specialty quote and is listed as an allowance unless you provide one.
The fee is fixed per project and quoted free within the hour on working days. It depends on sheet count, element variety and scope, with no retainer and no minimum.
Most concrete estimates are delivered in 24 to 48 hours from approval. Large multi-level frames can take longer, and the quote states the date before you commit.
Yes. Send the mix designs or supplier quotes and we price to them. Otherwise we use regional unit costs for your ZIP code and label the source.
No. General contractors, developers and owners order concrete estimates too. The workbook is the same, only the markups and scope notes change.
More structural trades we estimate
Get a fixed quote for your concrete takeoff
Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.