Roofing Estimating Services
Roofing estimating measures roof areas, slopes, edges and penetrations and prices the membrane or roof covering, insulation and flashing systems. Nova Estimation takes off roofs by square from the roof plans and details, counts drains, curbs and penetrations, and delivers a roofing estimate for commercial or residential work in 24 to 48 hours.
- CSI Division 07 Thermal and Moisture Protection
- 24 to 48 hour delivery
- Excel + marked-up PDFs
Why do roofing bids go wrong?
-
Pitch changes the area
A roof plan shows the footprint, not the surface. Without the slope factor, squares and underlayment are under-ordered on every steep roof.
-
Flashing and edge metal are counted late
Eaves, rakes, valleys, penetrations and curbs add linear feet and labor that a squares-only bid leaves out.
-
Tear-off and access hide labor
Layers to remove, steep access and haul-off change the labor price, yet appear on few quick bids.
What do we measure in a roofing takeoff?
Every roofing item is measured from your sheets and carried in the units your crews and suppliers price in.
- Asphalt Shingles, roofing squares, 100 SF of finished roof
- Underlayment & Ice Shield
- Roof Insulation · Polyiso
- Flashing & Edge Metal
- Roof Accessories
How is a roofing estimate priced?
Roofs are measured by square, but the area on plan is not the area installed. We apply pitch factors to sloped roofs and measure parapets, curbs and crickets as their own areas, because they add material and labor that a flat footprint misses.
Edge metal, flashings, drains, overflow scuppers and penetrations are counted from the details. Tapered insulation is measured by zone so the average thickness, and the cost, is right.
What do our estimators check on a roofing set?
We measure each roof plane from the roof plan using the stated pitch, so the area is the roof surface and not the footprint. Valleys, ridges, hips, eaves and rakes are measured in linear feet from the plan and details.
Penetrations, curbs, drains and scuppers are counted, and the specification decides underlayment, insulation and warranty items. For re-roofs we note tear-off layers, deck repair allowances and access, because they change labor sharply.
What do roofing bids usually miss?
These are the items we check on every set, because they are where bids lose money.
- 01
Waste by pitch and plane count, a cut-up roof wastes far more than the same area on two slopes.
- 02
Every linear-foot detail: eave, rake, ridge, hip, valley, wall flashing and counterflashing.
- 03
Penetrations counted off the mechanical and plumbing plans, not the roof plan.
- 04
Tapered insulation layout, crickets and saddles, which are a separate design and a separate cost.
What does a roofing estimate look like?
Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.
| CSI | Item | Quantity |
|---|---|---|
| 07 31 13 | Asphalt shingles | 38.4 SQ |
| 07 25 00 | Underlayment & ice shield | 4,120 SF |
| 07 22 00 | Roof insulation, polyiso | 3,860 SF |
| 07 62 00 | Flashing & edge metal | 486 LF |
| 07 72 00 | Roof accessories | 24 EA |
Illustrative structure only. Your estimate is measured from your own drawings.
What kinds of roofing projects do we estimate?
We estimate roofing for houses, apartments, warehouses, schools and retail buildings, from shingles and metal to single-ply membranes. Roof planes, flashing and accessories are measured separately so alternates are easy to price.
Why use Nova Estimation for roofing estimating?
-
Surface area, not footprint
Roof planes are measured with pitch applied, so squares reflect the roof you will actually cover.
-
Flashing counted in linear feet
Valleys, ridges, edges and penetrations are listed with their own quantities.
-
Tear-off and access noted
Existing layers, deck repair allowances and access conditions appear as separate lines.
Who orders a roofing estimate?
- 01
Roofing contractors pricing new and re-roof work
- 02
General contractors comparing roofing subcontractor bids
- 03
Property owners and managers budgeting a roof replacement
What should you send for a roofing estimate?
These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.
- Roof plans and elevations
- Roof sections and flashing details
- Roofing specification and warranty requirements
- Existing roof information for re-roofs
- Addenda and bid forms
- Any aerial measurement report
How do you order a roofing estimate?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the roof plans, details, elevations, specifications and any existing-condition notes.
About 2 minutesQuote
We confirm the roof system, tear-off scope and warranty requirements, then send the fee.
Within the hourEstimate
Roof planes are measured by pitch in squares, with edges, flashing and accessories counted from the details.
24 to 48 hoursDeliver
You receive the workbook with a marked-up roof plan showing each plane and quantity.
Bid day ready
Bidding roofing this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does a roofing estimate cost?
A roofing estimate is quoted as a fixed fee that depends on the number of roof sheets, the number of separate roof planes and levels, and whether the work is new construction or re-roofing with tear-off.
A single pitched roof is quick to measure, while a low-slope commercial roof with many curbs and penetrations takes longer. The fee arrives free, within the hour on working days.
Roofing estimating questions
Yes. Commercial membrane, metal and built-up roofs, and residential shingle, tile and metal roofs.
Sloped roof areas are measured with the correct pitch factor, so the installed area matches what the crew will actually cover.
Yes. Tapered systems are measured by zone with crickets and saddles, to get the correct average thickness.
Yes. Perimeter edge, coping, counterflashing and penetration flashings are measured from the roof details.
Yes. Tear-off, disposal and deck repair allowances are included where the drawings or scope call for them.
The fee is fixed per project and quoted free within the hour on working days, based on roof complexity and sheet count. No retainer and no minimum.
Most roofing estimates arrive in 24 to 48 hours from approval, with the date shown in the quote.
Yes. Shingle, metal, TPO, EPDM and modified bitumen are measured by their own units, including seams, insulation and edge metal.
Yes. If you have a measurement report, send it with the plans and we reconcile the two before pricing.