Utility Estimating Services
Utility estimating measures the storm, sanitary, water and fire service lines on a site and prices the trenching, pipe, structures and restoration to install them. Nova Estimation takes off pipe by size, material and depth from the utility plans and profiles, counts manholes, inlets and fittings, and delivers a utility estimate in 24 to 48 hours.
- CSI Division 33 Utilities
- 24 to 48 hour delivery
- Excel + marked-up PDFs
Why do utilities bids go wrong?
-
Pipe length is read off the wrong sheet
Plan view shows horizontal length, but the profile sheet shows depth, bedding and structures that change the price.
-
Structures are an afterthought
Manholes, inlets and vaults cost far more than the pipe between them, but are often counted loosely.
-
Trench conditions vary
Depth, soil and dewatering decide trench cost, and a flat per-foot rate misses all three.
What do we measure in a utility takeoff?
Every utilities item is measured from your sheets and carried in the units your crews and suppliers price in.
- Water Main · 8" DI
- Sanitary Sewer · 8" PVC
- Storm Drain · 15" RCP
- Structures & Manholes
- Valves & Hydrants
How is a utility estimate priced?
Utility cost depends on depth as much as length, because deeper trenches need more excavation, shoring and backfill. We measure each run from the plan and profile, by size, material and depth band.
Manholes, catch basins, inlets, cleanouts, valves and hydrants are counted with their depths. Bedding, backfill, testing and surface restoration are included as separate lines.
What do our estimators check on a utility set?
We use the plan and profile sheets together. Pipe length and depth come from the profiles, and the plan shows alignment, connections and structures.
Structures are counted by type and depth, and trench excavation, bedding and backfill are calculated from the details and soil report. Testing, bypass and connection fees are listed as separate lines.
What do utilities bids usually miss?
These are the items we check on every set, because they are where bids lose money.
- 01
Trench depth driving the real cost, the same pipe at 12 feet is a different bid than at 4 feet.
- 02
Rock, dewatering, sheeting and shoring where the geotechnical report says to expect them.
- 03
Bedding, backfill material and compaction testing, specified separately from the pipe.
- 04
Connection fees, permits, tapping and utility company coordination.
What does a utility estimate look like?
Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.
| CSI | Item | Quantity |
|---|---|---|
| 33 11 00 | Water main, 8" di | 640 LF |
| 33 31 00 | Sanitary sewer, 8" pvc | 580 LF |
| 33 41 00 | Storm drain, 15" rcp | 420 LF |
| 33 05 61 | Structures & manholes | 12 EA |
| 33 12 16 | Valves & hydrants | 8 EA |
Illustrative structure only. Your estimate is measured from your own drawings.
What kinds of utilities projects do we estimate?
Our utility estimates cover water mains, sanitary sewer, storm drainage, hydrants and service connections for subdivisions, commercial sites and municipal projects. Each system shows pipe by size and depth, with structures counted by type.
Why use Nova Estimation for utilities estimating?
-
Pipe by run and depth
Water, sanitary and storm lines are measured by size, material and trench depth from plan and profile.
-
Structures counted
Manholes, inlets, hydrants, valves and vaults are counted by type and depth.
-
Trench conditions priced
Bedding, backfill and shoring are carried explicitly.
Who orders a utility estimate?
- 01
Utility contractors pricing water, sewer and storm systems
- 02
Site contractors comparing underground subcontractor bids
- 03
Developers budgeting infrastructure
What should you send for a utility estimate?
These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.
- Utility plans and profile sheets
- Utility details and standard drawings
- Geotechnical report
- Specification sections for utilities
- Utility company requirements
- Addenda and bid forms
How do you order a utility estimate?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the utility plans, profile sheets, details, geotechnical report and the specification.
About 2 minutesQuote
We confirm pipe materials, connection scope and whether testing is included.
Within the hourEstimate
Pipe and structures are taken off by run and depth, then priced with trench and bedding.
24 to 48 hoursDeliver
You receive the workbook, marked-up plans and a summary by system.
Bid day ready
Bidding utilities this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does a utility estimate cost?
A utilities estimate is a fixed fee that depends on the number of utility sheets, the length and number of systems and the number of structures.
A short service connection is quicker than a subdivision with several lift stations. The quote arrives free, usually within the hour on working days.
Utilities estimating questions
Yes. Each run is measured by depth band from the profiles, because depth drives excavation and shoring cost.
Yes. Manholes, inlets and catch basins are counted with their depths and frames.
Yes. Water mains, services, fire lines, valves and hydrants are measured from the plans.
Where utilities cross existing pavement, saw cutting and restoration are measured.
Electric, telecom and gas duct banks can be included where they are drawn on the site plans.
The fee is fixed per project and quoted free within the hour on working days, with no retainer and no minimum.
Typically 24 to 48 hours from approval.
Yes. Depth, slope and structure data come from the profile sheets, so trench volumes and bedding match the design.
Yes. Each system is measured separately and totaled as one package or priced apart.