Earthwork Estimating Services
Earthwork estimating calculates how much soil a site needs to cut, fill, import or export to reach design grades. Nova Estimation compares existing and proposed surfaces from the grading plans, separates topsoil stripping, structural excavation and trenching, and prices the equipment and haul time in an earthwork estimate.
- CSI Division 31 Earthwork
- 24 to 48 hour delivery
- Excel + marked-up PDFs
Why do earthwork bids go wrong?
-
Cut and fill never balance on paper
Surface-to-surface volumes depend on the existing and proposed grades, and a rough average depth misses both swell and shrink.
-
Haul distance changes the price
Export, import and on-site haul routes drive equipment hours, yet most bids carry one cubic yard rate.
-
Unsuitable soils surface late
Topsoil stripping, undercut and soil replacement come from the geotechnical report, and are often left out of the first number.
What do we measure in an earthwork takeoff?
Every earthwork item is measured from your sheets and carried in the units your crews and suppliers price in.
- Cut · Common
- Fill & Compaction
- Export / Haul Off
- Clear & Grub
- Erosion Control
How is an earthwork estimate priced?
Earthwork volumes come from comparing the existing ground with the proposed grades. We calculate cut and fill by area, adjust for topsoil stripping and the thickness of pavement and slab sections, and apply shrink and swell factors so the balance reflects compacted volumes.
Building excavation, footings and utility trenches are measured separately from mass grading. Production and haul assumptions are shown as their own lines so they can be matched to your equipment.
What do our estimators check on an earthwork set?
We compare the existing and proposed surfaces from the grading plan and survey, calculating cut and fill by area. Stripping depth, undercut and subgrade prep come from the geotechnical report and specification.
Swell and shrink factors are applied, haul routes and distances are stated, and import and export quantities are shown separately. Erosion control and temporary measures are measured from their plans.
What do earthwork bids usually miss?
These are the items we check on every set, because they are where bids lose money.
- 01
Shrink and swell factors between bank, loose and compacted volumes, three different numbers.
- 02
Topsoil strip, stockpile and respread, which is volume handled twice.
- 03
Haul distance and disposal fees, which usually cost more than the excavation itself.
- 04
Dewatering, undercut and unsuitable material, carried as an allowance with a stated basis.
What does an earthwork estimate look like?
Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.
| CSI | Item | Quantity |
|---|---|---|
| 31 23 16 | Cut, common | 4,820 CY |
| 31 23 23 | Fill & compaction | 3,140 CY |
| 31 23 19 | Export / haul off | 1,680 CY |
| 31 10 00 | Clear & grub | 2.4 AC |
| 31 25 00 | Erosion control | 1,840 LF |
Illustrative structure only. Your estimate is measured from your own drawings.
What kinds of earthwork projects do we estimate?
We estimate earthwork for building pads, parking lots, roads, subdivisions and warehouses. Each estimate shows cut, fill, export and import by area, so you can see where the volume sits and adjust haul assumptions.
Why use Nova Estimation for earthwork estimating?
-
Volumes from surfaces
Cut and fill are calculated between existing and proposed surfaces from the grading plan.
-
Swell and shrink applied
Soil factors from the geotechnical report are applied to loose and compacted yardage.
-
Haul and disposal separated
Export, import and on-site haul are separate lines with distances stated.
Who orders an earthwork estimate?
- 01
Excavation and grading contractors pricing site packages
- 02
General contractors comparing sitework subcontractor bids
- 03
Developers testing land development budgets
What should you send for an earthwork estimate?
These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.
- Civil and grading plans
- Topographic survey in PDF or CAD
- Geotechnical report
- Erosion and sediment control plans
- Specification sections for earthwork
- Addenda and bid forms
How do you order an earthwork estimate?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the civil plans, grading plan, topographic survey, geotechnical report and the specification.
About 2 minutesQuote
We confirm soil assumptions, haul distances and whether stripping and undercut are in scope.
Within the hourEstimate
Cut and fill are calculated by area and depth, with swell, shrink and haul applied.
24 to 48 hoursDeliver
You receive the workbook with marked-up grading plans and a volume summary by area.
Bid day ready
Bidding earthwork this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does an earthwork estimate cost?
An earthwork estimate is a fixed fee that depends on the number of civil sheets, the size and complexity of the site and whether the geotechnical report is included in the review.
A simple building pad is quicker than a phased subdivision with several borrow and stockpile areas. The quote arrives free, usually within the hour on working days.
Earthwork estimating questions
By comparing existing and proposed surfaces from the grading plans, using cross sections or surface comparison, with pavement and slab sections deducted.
Yes. Factors are stated in the estimate and can be changed to match the soils report.
Where borings or the geotechnical report show rock, it is listed separately or as an allowance.
Yes. The site balance shows the import or export quantity and the haul cost.
Yes. CAD surfaces give the most precise volumes. PDF grading plans work for most projects.
The fee is fixed per project and quoted free within the hour on working days, with no retainer and no minimum.
Most earthwork estimates arrive in 24 to 48 hours from approval, and the quote shows the date.
Yes. Cut, fill and the net import or export volume are listed so you can price hauling.
Yes, when the geotechnical report shows them. Rock, dewatering and shoring are listed as separate lines or allowances.