Earthwork estimating calculates how much soil a site needs to cut, fill, import or export to reach design grades. Nova Estimation compares existing and proposed surfaces from the grading plans, separates topsoil stripping, structural excavation and trenching, and prices the equipment and haul time in an earthwork estimate.

  • CSI Division 31 Earthwork
  • 24 to 48 hour delivery
  • Excel + marked-up PDFs
The problem

Why do earthwork bids go wrong?

  • Cut and fill never balance on paper

    Surface-to-surface volumes depend on the existing and proposed grades, and a rough average depth misses both swell and shrink.

  • Haul distance changes the price

    Export, import and on-site haul routes drive equipment hours, yet most bids carry one cubic yard rate.

  • Unsuitable soils surface late

    Topsoil stripping, undercut and soil replacement come from the geotechnical report, and are often left out of the first number.

Scope

What do we measure in an earthwork takeoff?

Every earthwork item is measured from your sheets and carried in the units your crews and suppliers price in.

  • Cut · Common
  • Fill & Compaction
  • Export / Haul Off
  • Clear & Grub
  • Erosion Control
CYcut, fill, export by state
ACclearing, stripping, seeding
LFerosion control, silt fence
SFstabilisation and matting
How we price it

How is an earthwork estimate priced?

Earthwork volumes come from comparing the existing ground with the proposed grades. We calculate cut and fill by area, adjust for topsoil stripping and the thickness of pavement and slab sections, and apply shrink and swell factors so the balance reflects compacted volumes.

Building excavation, footings and utility trenches are measured separately from mass grading. Production and haul assumptions are shown as their own lines so they can be matched to your equipment.

Method

What do our estimators check on an earthwork set?

We compare the existing and proposed surfaces from the grading plan and survey, calculating cut and fill by area. Stripping depth, undercut and subgrade prep come from the geotechnical report and specification.

Swell and shrink factors are applied, haul routes and distances are stated, and import and export quantities are shown separately. Erosion control and temporary measures are measured from their plans.

Risk

What do earthwork bids usually miss?

These are the items we check on every set, because they are where bids lose money.

  1. 01

    Shrink and swell factors between bank, loose and compacted volumes, three different numbers.

  2. 02

    Topsoil strip, stockpile and respread, which is volume handled twice.

  3. 03

    Haul distance and disposal fees, which usually cost more than the excavation itself.

  4. 04

    Dewatering, undercut and unsuitable material, carried as an allowance with a stated basis.

Deliverable

What does an earthwork estimate look like?

Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.

Earthwork estimate.xlsxIllustrative sample
Illustrative line items, not from a client project
CSIItemQuantity
31 23 16Cut, common4,820 CY
31 23 23Fill & compaction3,140 CY
31 23 19Export / haul off1,680 CY
31 10 00Clear & grub2.4 AC
31 25 00Erosion control1,840 LF

Illustrative structure only. Your estimate is measured from your own drawings.

Projects

What kinds of earthwork projects do we estimate?

We estimate earthwork for building pads, parking lots, roads, subdivisions and warehouses. Each estimate shows cut, fill, export and import by area, so you can see where the volume sits and adjust haul assumptions.

Why Nova

Why use Nova Estimation for earthwork estimating?

  • Volumes from surfaces

    Cut and fill are calculated between existing and proposed surfaces from the grading plan.

  • Swell and shrink applied

    Soil factors from the geotechnical report are applied to loose and compacted yardage.

  • Haul and disposal separated

    Export, import and on-site haul are separate lines with distances stated.

Who orders it

Who orders an earthwork estimate?

  1. 01

    Excavation and grading contractors pricing site packages

  2. 02

    General contractors comparing sitework subcontractor bids

  3. 03

    Developers testing land development budgets

What to send

What should you send for an earthwork estimate?

These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.

  • Civil and grading plans
  • Topographic survey in PDF or CAD
  • Geotechnical report
  • Erosion and sediment control plans
  • Specification sections for earthwork
  • Addenda and bid forms
How it works

How do you order an earthwork estimate?

You know the fee and the delivery date before we start. No retainers and no hourly billing.

  1. Upload

    Send the civil plans, grading plan, topographic survey, geotechnical report and the specification.

    About 2 minutes
  2. Quote

    We confirm soil assumptions, haul distances and whether stripping and undercut are in scope.

    Within the hour
  3. Estimate

    Cut and fill are calculated by area and depth, with swell, shrink and haul applied.

    24 to 48 hours
  4. Deliver

    You receive the workbook with marked-up grading plans and a volume summary by area.

    Bid day ready

Bidding earthwork this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

Pricing

How much does an earthwork estimate cost?

An earthwork estimate is a fixed fee that depends on the number of civil sheets, the size and complexity of the site and whether the geotechnical report is included in the review.

A simple building pad is quicker than a phased subdivision with several borrow and stockpile areas. The quote arrives free, usually within the hour on working days.

FAQ

Earthwork estimating questions

By comparing existing and proposed surfaces from the grading plans, using cross sections or surface comparison, with pavement and slab sections deducted.

Yes. Factors are stated in the estimate and can be changed to match the soils report.

Where borings or the geotechnical report show rock, it is listed separately or as an allowance.

Yes. The site balance shows the import or export quantity and the haul cost.

Yes. CAD surfaces give the most precise volumes. PDF grading plans work for most projects.

The fee is fixed per project and quoted free within the hour on working days, with no retainer and no minimum.

Most earthwork estimates arrive in 24 to 48 hours from approval, and the quote shows the date.

Yes. Cut, fill and the net import or export volume are listed so you can price hauling.

Yes, when the geotechnical report shows them. Rock, dewatering and shoring are listed as separate lines or allowances.

Related trades

More civil & sitework trades we estimate

Get a fixed quote

Get a fixed quote for your earthwork takeoff

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.