Nova Estimation

Mechanical Estimating Services

Mechanical estimating covers the ductwork, sheet metal, hydronic piping and equipment that make up a building's mechanical systems. Nova Estimation measures duct by weight and gauge, piping by size and material, and counts equipment from the schedules, delivering a mechanical estimate ready for sheet metal and pipe trade pricing.

  • CSI Division 23 HVAC
  • 24 to 48 hour delivery
  • Excel + marked-up PDFs
The problem

Why do mechanical bids go wrong?

  • Process and building mechanical overlap

    Hydronic piping, pumps and plant equipment fall between HVAC and plumbing, and scope gaps surface at buyout.

  • Pipe and valve counts are underestimated

    Fittings, valves, specialties and supports add large costs to piping systems that bids often reduce to one rate.

  • Insulation and supports are unpriced

    Pipe insulation, hangers and seismic bracing are required by spec but missed on a plan-only count.

Scope

What do we measure in a mechanical takeoff?

Every mechanical item is measured from your sheets and carried in the units your crews and suppliers price in.

  • Hydronic Piping
  • Chillers & Pumps
  • Pumps & Accessories
  • Pipe Insulation
  • Testing & Balancing
LFpipe by size and service
EAequipment, pumps, valves
TONcooling capacity
LStesting, balancing, commissioning
How we price it

How is a mechanical estimate priced?

Mechanical work is usually split between sheet metal and piping trades, so we structure the estimate the same way. Sheet metal is measured by duct size and converted to weight, and piping is measured by system, size and material.

Chilled water, heating hot water, condenser water and steam systems are taken off with their valves, fittings, insulation and hangers. Major equipment is counted from the schedules with rigging and connections listed separately.

Method

What do our estimators check on a mechanical set?

We trace each piping system from the diagrams, measuring pipe by size and material from the plans. Pumps, boilers, chillers and other equipment are listed from the schedules with their connections.

Valves, strainers, gauges and specialties are counted, and insulation and supports are added by pipe size. Testing, flushing and commissioning items are carried as separate lines.

Risk

What do mechanical bids usually miss?

These are the items we check on every set, because they are where bids lose money.

  1. 01

    Rigging and access for plant equipment, which can exceed the equipment cost on a retrofit.

  2. 02

    Piping specialities, valves, strainers, expansion, air separation, counted per system.

  3. 03

    Seismic restraint and housekeeping pads carried by the right trade.

  4. 04

    Start-up, balancing and commissioning as scheduled scope, not an afterthought.

Deliverable

What does a mechanical estimate look like?

Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.

Mechanical estimate.xlsxIllustrative sample
Illustrative line items, not from a client project
CSIItemQuantity
23 21 13Hydronic piping1,640 LF
23 64 00Chillers & pumps4 EA
23 21 23Pumps & accessories6 EA
23 07 19Pipe insulation1,640 LF
23 05 93Testing & balancing1 LS

Illustrative structure only. Your estimate is measured from your own drawings.

Projects

What kinds of mechanical projects do we estimate?

Our mechanical estimates cover boiler and chiller plants, hydronic heating and cooling, process piping and equipment rooms in commercial, institutional and industrial buildings. Quantities appear by system, so each loop can be adjusted or excluded.

Why Nova

Why use Nova Estimation for mechanical estimating?

  • Piping by system

    Hydronic, steam, refrigerant and process piping are measured by size and material.

  • Valves and specialties counted

    Every valve, strainer, gauge and specialty is counted from the diagrams.

  • Insulation and supports listed

    Insulation by thickness and hanger quantities are separate lines.

Who orders it

Who orders a mechanical estimate?

  1. 01

    Mechanical contractors pricing plant rooms and piping systems

  2. 02

    General contractors comparing mechanical subcontractor bids

  3. 03

    Owners budgeting central plant upgrades

What to send

What should you send for a mechanical estimate?

These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.

  • Mechanical plans and plant room layouts
  • Piping diagrams and flow schematics
  • Equipment schedules
  • Mechanical specification sections
  • Addenda and bid forms
  • Any vendor quotes for pumps, boilers or chillers
How it works

How do you order a mechanical estimate?

You know the fee and the delivery date before we start. No retainers and no hourly billing.

  1. Upload

    Send the mechanical plans, plant room drawings, piping diagrams, schedules and the specification.

    About 2 minutes
  2. Quote

    We confirm equipment supply, insulation and testing scope, then send the fee.

    Within the hour
  3. Estimate

    Piping, equipment, valves and insulation are measured and counted by system.

    24 to 48 hours
  4. Deliver

    You receive the workbook, marked-up plans and a quantity summary by system.

    Bid day ready

Bidding mechanical this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

Pricing

How much does a mechanical estimate cost?

A mechanical estimate is a fixed fee that depends on the number of mechanical sheets, the number of piping systems and how much plant equipment is in scope.

A small boiler room is faster than a campus plant with several loops. Send the drawings and the fee arrives free, usually within the hour on working days.

FAQ

Mechanical estimating questions

Mechanical estimating covers the full mechanical scope, including central plant piping and equipment. HVAC estimating focuses on air distribution and systems for smaller buildings.

Yes. Duct is measured by weight and gauge so it can be priced for fabrication and installation.

Yes. Chilled water, heating water and condenser water piping are measured by size and material.

Rigging and setting of major equipment is listed as its own line, based on equipment size and location.

Yes, where it is drawn, by system, size and material.

The fee is fixed per project and quoted free within the hour on working days. No retainer and no minimum.

Most mechanical estimates are delivered in 24 to 48 hours from approval.

Mechanical estimating covers plant equipment and piping systems. HVAC estimating focuses on air distribution. Many projects need both, and we price them together or apart.

Yes. Insulation is measured by pipe size, thickness and length and priced separately.

Related trades

More MEP trades we estimate

Get a fixed quote

Get a fixed quote for your mechanical takeoff

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.