Framing Estimating Services
Framing estimating counts the studs, plates, headers, joists, rafters, trusses and sheathing in a set of plans and prices the lumber and labor to build them. Nova Estimation produces a lumber takeoff grouped the way yards quote it, with hardware and connectors listed, usually within 24 to 48 hours.
- CSI Division 06 Wood, Plastics and Composites
- 24 to 48 hour delivery
- Excel + marked-up PDFs
Why do framing bids go wrong?
-
Lumber counts that ignore waste and specials
Studs, plates and blocking add up differently on every wall, and engineered members are priced by length, not count.
-
Wall types vary floor by floor
Exterior, demising, shear and bearing walls each need different framing, and a flat rate per square foot hides the difference.
-
Lumber prices move weekly
A takeoff that mixes quantities with a stale price sheet is wrong before it is delivered.
What do we measure in a framing takeoff?
Every framing item is measured from your sheets and carried in the units your crews and suppliers price in.
- Stud Walls · 2x6
- Floor Joists / I-joist
- Roof Trusses
- Sheathing · Wall/roof
- Hangers & Connectors
How is a framing estimate priced?
A lumber takeoff has to match how lumber is sold: by species, grade, dimension and length. We count every member and group them that way, so the list can go straight to several suppliers for pricing.
Labor is priced by assembly, walls, floors and roofs, because framing productivity changes with wall height, roof pitch and complexity. Hardware such as hangers, straps, hold-downs and anchors is counted from the structural details, not estimated as a percentage.
What do our estimators check on a framing set?
We begin with the plans and wall sections to identify each wall type, then measure lengths and heights by floor. Studs are counted at the specified spacing with corners, intersections and openings added, and plates, headers and blocking are taken from the details.
Floors and roofs are measured from the framing plans and truss or joist layouts. Engineered members are listed by size and length, sheathing by area and hardware by count. The lumber summary groups sizes and lengths so your supplier can quote directly.
What do framing bids usually miss?
These are the items we check on every set, because they are where bids lose money.
- 01
Blocking, backing and fire-stopping, which never appear on the framing plan but always get built.
- 02
Headers, king and jack studs at every opening, counted per opening rather than per wall.
- 03
Hold-downs, straps and shear-wall nailing from the structural notes, not the architectural plan.
- 04
Waste on plate stock, studs cut to non-standard heights, and pick-up carpentry after other trades.
What does a framing estimate look like?
Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.
| CSI | Item | Quantity |
|---|---|---|
| 06 11 00 | Stud walls, 2x6 | 1,860 LF |
| 06 11 10 | Floor joists / i-joist | 4,120 SF |
| 06 17 53 | Roof trusses | 46 EA |
| 06 16 00 | Sheathing, wall/roof | 7,340 SF |
| 06 05 23 | Hangers & connectors | 1 LS |
Illustrative structure only. Your estimate is measured from your own drawings.
What kinds of framing projects do we estimate?
We estimate framing for single-family and multifamily homes, townhomes, light commercial buildings and additions. Walls, floors and roofs are measured by assembly, with lumber summaries ready for your supplier.
Why use Nova Estimation for framing estimating?
-
Wall by wall quantities
Every wall type is measured with studs, plates, headers and blocking, so the lumber list matches the plans.
-
Engineered lumber listed by length
Beams, joists and trusses are listed by size and length with the manufacturer's call-outs noted.
-
Separate material and labor
Lumber and labor are priced apart, so changes in the lumber market do not force a new estimate.
Who orders a framing estimate?
- 01
Framing contractors pricing a labor and material package
- 02
Home builders ordering lumber packages from one takeoff
- 03
General contractors comparing framing subcontractor bids
What should you send for a framing estimate?
These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.
- Floor plans and building sections
- Wall sections and framing details
- Truss and joist layouts
- Structural notes and engineered lumber schedules
- Addenda and bid forms
- Lumber price lists if you hold them
How do you order a framing estimate?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send floor plans, wall sections, structural details and the truss or joist layouts.
About 2 minutesQuote
We confirm whether you want a lumber list, a labor price or both, then send the fee.
Within the hourEstimate
Walls, floors and roofs are measured by assembly, then priced to your ZIP code.
24 to 48 hoursDeliver
You receive the workbook, marked-up plans and a lumber summary by size and length.
Bid day ready
Bidding framing this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does a framing estimate cost?
A framing estimate is quoted as a fixed fee that depends on the number of floors, the variety of wall and roof assemblies and whether you want a lumber list only or full labor and material pricing.
A repeated house plan is faster than a mixed-use building with changing wall types, and the fee reflects that. The figure arrives free, within the hour on working days.
Framing estimating questions
Yes. The lumber takeoff is grouped by species, grade, size and length, ready to send to more than one yard for quotes.
Both. Engineered trusses are listed by type and count for a truss quote, while stick-framed roofs are measured member by member.
Yes. Wall, floor and roof sheathing are measured by area and converted to sheets, with waste shown separately.
Yes. Hangers, straps, hold-downs and anchor bolts are counted from the structural details and shear wall schedule.
Yes. Metal stud framing is usually estimated with drywall, by gauge and stud spacing, under our drywall estimating service.
The fee is fixed per project and quoted free within the hour on working days. It depends on floors, assemblies and scope, with no retainer and no minimum.
Most framing estimates are delivered in 24 to 48 hours from approval, and the quote states the date.
Yes. Wall, floor and roof framing are measured from the plans and listed separately.
Yes, using the truss layouts and beam schedules in the set. Where a manufacturer designs them, we carry an allowance and list what is missing.
More structural trades we estimate
Get a fixed quote for your framing takeoff
Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.