Nova Estimation

Sitework Estimating Services

Sitework estimating prices everything outside the building: clearing, demolition, grading, excavation, erosion control and site improvements. Nova Estimation measures site and civil drawings item by item, calculates excavation volumes and counts site features, and delivers a sitework estimate organized the way site contractors bid.

  • CSI Division 31 Earthwork
  • 24 to 48 hour delivery
  • Excel + marked-up PDFs
The problem

Why do sitework bids go wrong?

  • Sitework scope is scattered across the plans

    Demolition, grading, utilities, paving and landscaping appear on separate sheets, and gaps appear when each is priced alone.

  • Quantities depend on elevations

    Curbs, walls and slabs change with grade, and a plan-view count misses height.

  • Phasing and access cost money

    Traffic control, phasing and tight sites change productivity, but rarely show up in the first price.

Scope

What do we measure in a sitework takeoff?

Every sitework item is measured from your sheets and carried in the units your crews and suppliers price in.

  • Curb & Gutter
  • Sidewalk · 4" Concrete
  • Fencing
  • Pavement Marking & Signs
  • Site Restoration
LFcurb, fence, edging
SFwalks, pads, hardscape
ACrestoration and seeding
EAsigns, bollards, site furnishings
How we price it

How is a sitework estimate priced?

Sitework covers many small items that are easy to miss: clearing and grubbing, demolition of existing features, erosion control, construction entrances, fencing, site furnishings and signage. We collect them from the site, civil and landscape drawings and the specifications.

Excavation for the building, footings and site structures is measured separately from mass grading. Curbs, sidewalks and site concrete are measured by length and area, and restoration is included wherever existing surfaces are disturbed.

Method

What do our estimators check on a sitework set?

We combine the civil, landscape and architectural site plans to build a single view of the site. Demolition, clearing, grading, utilities, paving and site concrete are each measured from their own sheets.

Quantities are cross-checked between sheets, since a curb on the civil plan must match the paving plan. Phasing, traffic control and mobilization are listed as separate lines.

Risk

What do sitework bids usually miss?

These are the items we check on every set, because they are where bids lose money.

  1. 01

    Everything outside the building line that the architectural set stops short of showing.

  2. 02

    Site concrete formwork, jointing and finishing, priced separately from the flatwork area.

  3. 03

    Traffic control, phasing and access maintenance on an occupied site.

  4. 04

    Final restoration, seeding and the punch-list return visit after the building trades leave.

Deliverable

What does a sitework estimate look like?

Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.

Sitework estimate.xlsxIllustrative sample
Illustrative line items, not from a client project
CSIItemQuantity
32 16 13Curb & gutter1,240 LF
32 16 23Sidewalk, 4" conc.3,180 SF
32 31 13Fencing860 LF
32 17 23Pavement marking & signs1 LS
32 90 00Site restoration1.8 AC

Illustrative structure only. Your estimate is measured from your own drawings.

Projects

What kinds of sitework projects do we estimate?

We estimate site development for retail pads, warehouses, apartments, schools and commercial campuses. Each estimate lists scopes by phase and area so you can price the whole site or a single package.

Why Nova

Why use Nova Estimation for sitework estimating?

  • Whole-site view

    Demolition, grading, utilities, paving and site concrete are reconciled across sheets.

  • Elevation-aware quantities

    Curbs, walls and slabs are measured with grade and height applied.

  • Phasing and access noted

    Traffic control, mobilization and phasing appear as separate lines.

Who orders it

Who orders a sitework estimate?

  1. 01

    Site contractors pricing complete site packages

  2. 02

    General contractors comparing sitework subcontractor bids

  3. 03

    Developers budgeting site development

What to send

What should you send for a sitework estimate?

These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.

  • Civil site plans and details
  • Architectural site plan
  • Landscape plans
  • Geotechnical report
  • Site specification sections
  • Addenda and bid forms
How it works

How do you order a sitework estimate?

You know the fee and the delivery date before we start. No retainers and no hourly billing.

  1. Upload

    Send the civil, landscape and architectural site plans, details and the site specification.

    About 2 minutes
  2. Quote

    We confirm which site scopes are in your price and any phasing requirements, then send the fee.

    Within the hour
  3. Estimate

    Each site scope is measured separately and reconciled across the sheets.

    24 to 48 hours
  4. Deliver

    You receive the workbook, marked-up site plans and a summary by scope.

    Bid day ready

Bidding sitework this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

Pricing

How much does a sitework estimate cost?

A sitework estimate is a fixed fee that depends on the number of site sheets, how many scopes are included and whether the site has phasing or demolition.

A single pad site is faster than a mixed-use block with several utilities. You receive the fee free, usually within the hour on working days.

FAQ

Sitework estimating questions

Clearing, demolition, grading, excavation, erosion control, site concrete, fencing and site furnishings. Utilities and paving can be included or estimated separately.

Yes. Building, footing and structure excavation are measured by volume, with backfill and compaction included.

Yes. Silt fence, inlet protection, construction entrances and stabilization are measured from the erosion control plan.

Yes, from the demolition plan, with disposal listed separately.

Yes. We follow the bid item list so the estimate maps directly onto your bid schedule.

The fee is fixed per project and quoted free within the hour on working days, with no retainer and no minimum.

Most are delivered in 24 to 48 hours from approval.

Yes. Demolition, grading, utilities, paving and site concrete can each be priced as a separate trade.

Yes. Earthwork, utilities and paving can each be estimated alone or combined.

Related trades

More civil & sitework trades we estimate

Get a fixed quote

Get a fixed quote for your sitework takeoff

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.