Civil Estimating Services
Civil estimating prices sitework, roads, utilities and heavy civil projects from civil drawings and grading plans. Nova Estimation calculates cut and fill volumes, measures pipe by size and depth, paving by section and stormwater structures by count, then prices labor, equipment and materials to the site location in an editable estimate.
- Fixed fee before work starts
- Editable Excel and marked-up PDFs
- Second estimator QA check
What does a civil estimate measure?
Civil work is priced by volume, length and production rate. Earthwork volumes come from comparing existing and proposed surfaces, pipe is measured by size, material and trench depth, and paving by layer thickness and area.
We calculate cut and fill, import and export, and topsoil stripping from the grading plans, then measure storm, sanitary and water lines with their structures, fittings and bedding. Roadway sections are measured layer by layer, from subgrade preparation to surface course.
Equipment and crew production drive civil pricing, so we show production assumptions on their own lines. You can adjust them to match your own fleet and crews.
Why do contractors struggle with civil estimating?
-
Quantities are volumes, not areas
Earthwork, pipe and paving depend on surfaces and profiles that plan view alone does not show.
-
Soils change the price
Rock, unsuitable soil and groundwater turn a standard price into a risk.
-
Permits and traffic add cost
Traffic control, SWPPP and inspections are easy to miss.
Which civil projects do we estimate?
- Site development and mass grading
- Roads, streets and parking lots
- Storm, sanitary and water utilities
- Stormwater ponds and detention
- Erosion and sediment control
- Municipal and public works bids
How do we prepare civil estimating?
We build the surface model from the grading plan and survey and compute cut and fill. Pipe is measured from plan and profile, structures are counted and paving is measured by section.
Erosion control, traffic control and testing are measured from their notes, and soil assumptions come from the geotechnical report.
Why use Nova Estimation for civil estimating?
-
Volumes from surfaces
Cut and fill come from the existing and proposed surfaces.
-
Plan and profile read together
Pipe length and depth match the profile sheets.
-
Soil assumptions written
Geotechnical assumptions are stated in the workbook.
Who uses our civil estimating?
- 01
Site-development contractors
- 02
Utility and paving subcontractors
- 03
Developers pricing land improvements
Which projects do we cover with civil estimating?
We estimate subdivisions, commercial sites, roads, utilities, stormwater and municipal civil projects.
What should you send for civil estimating?
Missing items are flagged in the quote, not guessed.
- Civil plans and profiles
- Topographic survey
- Geotechnical report
- SWPPP and permit notes
- Specification sections
- Addenda
How do you order civil estimating?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the civil drawings, survey, geotechnical report and specification.
About 2 minutesQuote
We confirm soil assumptions and scope, then send the fee.
Within the hourEstimate
Earthwork, utilities and paving are measured and priced.
24 to 48 hoursDeliver
You receive the workbook, markups and a quantity summary.
Bid day ready
Need civil estimating this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does civil estimating cost?
A civil estimate is a fixed fee that depends on sheet count, site size and the number of systems.
A single pad site is quicker than a subdivision with roads and utilities. The quote arrives free, usually within the hour on working days.
Civil Estimating questions
From the existing and proposed grades on the civil drawings, using cross sections or surface comparison. The results show cut, fill, import or export and topsoil separately.
Yes. We follow the bid item list in the bid form, so the estimate maps directly onto the schedule of values you submit.
Yes. Utility takeoffs measure pipe by size, material and depth, with structures, fittings, bedding and restoration.
Equipment and crew production rates are shown separately so you can replace them with your own fleet costs and production.
PDF drawings are enough for most projects. If you have CAD surfaces, they make earthwork volumes faster and more precise.
A fixed fee quoted free within the hour on working days.
Most are delivered in 24 to 48 hours from approval.
Yes. Volumes come from the existing and proposed surfaces.
Yes. Pipe, structures and ponds are measured individually.