Plumbing Estimating Services
Plumbing estimating counts the fixtures and equipment in a project and measures the domestic water, sanitary, vent and storm piping that serves them. Nova Estimation takes off piping by size and material from the plans and riser diagrams, counts fittings, valves and hangers, and delivers a plumbing estimate in 24 to 48 hours.
- CSI Division 22 Plumbing
- 24 to 48 hour delivery
- Excel + marked-up PDFs
Why do plumbing bids go wrong?
-
Pipe lengths come from guesses
Sanitary, domestic water and storm lines run on different sheets and elevations, and a fixture count alone misses the pipe.
-
Fittings and supports multiply the cost
Elbows, tees, hangers and valves can outweigh the straight pipe, but few bids count them.
-
Fixtures and equipment vary by spec
Fixture models, water heaters and pumps change the price sharply, yet are carried as one allowance.
What do we measure in a plumbing takeoff?
Every plumbing item is measured from your sheets and carried in the units your crews and suppliers price in.
- Fixtures By Mark
- Domestic Water Pipe
- Waste & Vent Pipe
- Valves & Specialties
- Water Heaters & Equipment
How is a plumbing estimate priced?
Plumbing is measured system by system: domestic cold and hot water, sanitary, vent, storm, gas and any process piping. Each system is taken off by pipe size and material, because copper, PEX, cast iron and PVC carry very different material and labor costs.
Fixtures and equipment come from the fixture schedule and are checked against the plans. Fittings, valves, cleanouts, hangers and insulation are counted with the piping, so the estimate reflects everything the crew installs.
What do our estimators check on a plumbing set?
We read the riser diagrams first, then measure sanitary, vent, domestic water and storm piping by size and material on each floor. Underground piping is measured from the site and ground floor plans.
Fixtures are counted from the schedule and plans, and valves, cleanouts, hangers and insulation are added from the details. Equipment such as water heaters and pumps is listed by model so substitutions can be repriced.
What do plumbing bids usually miss?
These are the items we check on every set, because they are where bids lose money.
- 01
Fixture carriers, trim and stops, which are counted per fixture and often left in the allowance.
- 02
Pipe by size and material separately, the same run in copper and PEX are different bids.
- 03
Hangers, sleeves, firestopping and insulation on every run through a rated assembly.
- 04
Excavation, bedding and backfill for underslab work, which belongs to this trade on most jobs.
What does a plumbing estimate look like?
Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.
| CSI | Item | Quantity |
|---|---|---|
| 22 42 00 | Fixtures by mark | 48 EA |
| 22 11 16 | Domestic water pipe | 1,860 LF |
| 22 13 16 | Waste & vent pipe | 1,420 LF |
| 22 05 23 | Valves & specialties | 86 EA |
| 22 33 00 | Water heaters & equip. | 4 EA |
Illustrative structure only. Your estimate is measured from your own drawings.
What kinds of plumbing projects do we estimate?
Our plumbing estimates cover restaurants and retail fit-outs, apartments, offices, schools and medical buildings. Each estimate shows pipe by system and size, fixtures by type and equipment by model so you can reprice any line without starting again.
Why use Nova Estimation for plumbing estimating?
-
Pipe by system and size
Sanitary, vent, water and storm are measured separately by pipe size and material.
-
Fittings and supports counted
Fittings, valves, hangers and insulation are listed with the pipe they serve.
-
Fixtures and equipment itemized
Each fixture type and piece of equipment is a separate line tied to the schedule.
Who orders a plumbing estimate?
- 01
Plumbing contractors pricing a fixtures and piping package
- 02
General contractors comparing plumbing subcontractor bids
- 03
Developers checking MEP budgets at design stage
What should you send for a plumbing estimate?
These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.
- Plumbing plans, all floors and site
- Riser diagrams and isometrics
- Fixture and equipment schedules
- Plumbing specification sections
- Addenda and bid forms
- Existing-condition notes for renovation work
How do you order a plumbing estimate?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the plumbing plans, risers, fixture and equipment schedules, details and the specification.
About 2 minutesQuote
We confirm pipe materials, whether site utilities are in scope and any alternates, then send the fee.
Within the hourEstimate
Pipe is taken off by system and size, fixtures and equipment are counted, and fittings and supports are added.
24 to 48 hoursDeliver
You receive the workbook, marked-up plans and a quantity summary by system.
Bid day ready
Bidding plumbing this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does a plumbing estimate cost?
A plumbing estimate is quoted as a fixed fee that depends on the number of plumbing sheets, how many systems and floors are involved and whether site utilities and equipment are included.
A single-story retail unit takes less time than a multi-story building with many risers. Send the drawings and the fee arrives free, usually within the hour on working days.
Plumbing estimating questions
Yes, and we check the count against the plans, reporting any differences.
Yes. Below-slab sanitary and storm piping are measured with trenching and bedding where they are part of the plumbing scope.
Yes, where specified, by pipe size and system.
Yes. Medical gas piping and outlets are measured from the plans where they are drawn.
Yes. Equipment from the plumbing schedules is counted with its connections.
The fee is fixed per project and quoted free within the hour on working days. No retainer and no minimum.
Most plumbing estimates arrive in 24 to 48 hours from approval, with the date confirmed in the quote.
Yes. Underground sanitary, storm and water services are measured separately from above-ground piping.
Yes. Copper, PEX, PVC, cast iron and other materials are measured and priced by their own unit costs.
More MEP trades we estimate
Get a fixed quote for your plumbing takeoff
Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.