Low Voltage Estimating Services
Low voltage estimating counts the data drops, devices and equipment in a building's technology systems and measures the cable and pathways that connect them. Nova Estimation takes off structured cabling, audio visual, paging and security from the technology drawings and delivers a low voltage estimate in 24 to 48 hours.
- CSI Division 27 Communications
- 24 to 48 hour delivery
- Excel + marked-up PDFs
Why do low voltage bids go wrong?
-
Drops are counted, pathways are not
Cable runs depend on routing, trays, conduit and rooms, so a device count alone underprices the job.
-
Systems overlap across trades
Data, audio visual, nurse call and security share pathways, and scope gaps appear at buyout.
-
Equipment changes late
Racks, switches and displays change during design, so a priced list needs clear assumptions.
What do we measure in a low voltage takeoff?
Every low voltage item is measured from your sheets and carried in the units your crews and suppliers price in.
- Data Outlets
- Backbone & Fiber
- Racks & Patch Panels
- Pathway & J-hooks
- Test & Certification
How is a low voltage estimate priced?
Low voltage work is device driven. We count outlets, drops, access points, cameras and speakers by type from the technology drawings, then calculate cable lengths from each device to its telecom room along the pathways shown.
Racks, patch panels, cable trays and terminations are counted for each telecom room. Testing, labeling and certification are included as separate lines, because they are part of every specification and often underpriced.
What do our estimators check on a low voltage set?
We count outlets and devices from the technology plans and tag each to its system. Cable lengths are measured by route from the closets to each location, with category and termination counts added.
Pathways such as tray, conduit and J-hooks are measured by length, and racks, patch panels and headend equipment are listed from the riser diagrams. Testing and certification are priced as their own lines.
What do low voltage bids usually miss?
These are the items we check on every set, because they are where bids lose money.
- 01
Cable lengths by actual pathway routing, with slack and service loops at both ends.
- 02
Termination, dressing, labelling and certification, priced per drop rather than per foot.
- 03
Pathway, sleeves and firestopping where the cable crosses a rated assembly.
- 04
Rack build, patching and the equipment boundary between the installer and the IT vendor.
What does a low voltage estimate look like?
Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.
| CSI | Item | Quantity |
|---|---|---|
| 27 15 00 | Data outlets | 124 EA |
| 27 13 00 | Backbone & fiber | 1,200 LF |
| 27 11 00 | Racks & patch panels | 6 EA |
| 27 05 28 | Pathway & j-hooks | 2,400 LF |
| 27 08 00 | Test & certification | 124 EA |
Illustrative structure only. Your estimate is measured from your own drawings.
What kinds of low voltage projects do we estimate?
We estimate low-voltage for offices, schools, hospitals, data rooms and multifamily buildings. Each estimate lists devices, cable and pathways by system, so scopes can be quoted together or alone.
Why use Nova Estimation for low voltage estimating?
-
Devices and drops counted
Outlets, devices and cable drops are counted by type from the plans.
-
Pathways measured
Cable tray, conduit and J-hooks are measured by length.
-
Equipment separated
Racks, panels and headend equipment are listed apart from cabling.
Who orders a low voltage estimate?
- 01
Low-voltage contractors pricing structured cabling and systems
- 02
Electrical contractors adding low-voltage scopes
- 03
General contractors comparing technology bids
What should you send for a low voltage estimate?
These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.
- Technology and low-voltage plans
- Riser and rack diagrams
- Device and outlet schedules
- Low-voltage specification sections
- Addenda and bid forms
- Owner equipment standards
How do you order a low voltage estimate?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the technology plans, riser diagrams, device schedules, details and the specification.
About 2 minutesQuote
We confirm which systems are in scope and the cabling category, then send the fee.
Within the hourEstimate
Devices, cable and pathways are counted and measured by system and room.
24 to 48 hoursDeliver
You receive the workbook, marked-up plans and a summary by system.
Bid day ready
Bidding low voltage this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does a low voltage estimate cost?
A low-voltage estimate is a fixed fee that depends on the number of technology sheets, the number of systems and the amount of headend equipment in scope.
A small office is quicker than a hospital with many integrated systems. The quote arrives free, usually within the hour on working days.
Low Voltage estimating questions
From each device to its telecom room along the pathways shown, with a stated allowance for slack and vertical runs.
Yes, where they are part of the low voltage scope.
Yes. AV devices and cabling are counted from the drawings. Head-end equipment is usually a vendor quote.
Yes. Cable testing, labeling and certification are carried as separate lines.
Cameras are included with low voltage or with access control, depending on your scope split.
The fee is fixed per project and quoted free within the hour on working days, with no retainer and no minimum.
Most are delivered in 24 to 48 hours from approval.
Structured cabling, audio visual, intercom, nurse call, paging and similar systems are covered, each priced as its own system.
Yes. Cable is measured by route and category, with termination counts for each device.
More specialty trades trades we estimate
Get a fixed quote for your low voltage takeoff
Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.