Nova Estimation

Masonry Estimating Services

Masonry estimating counts every CMU, brick and stone unit in a project and prices the mortar, grout, reinforcing and labor to lay them. Nova Estimation measures masonry by wall type and height, deducts openings correctly, counts lintels and accessories, and delivers a priced masonry estimate in 24 to 48 hours.

  • CSI Division 04 Masonry
  • 24 to 48 hour delivery
  • Excel + marked-up PDFs
The problem

Why do masonry bids go wrong?

  • Unit counts miss cut waste

    Corners, openings and pattern cuts consume more block and brick than the wall area suggests, and waste differs between CMU, brick and stone.

  • Grout and fill are guessed

    Fully grouted cells, partial fill and bond beams change grout volume sharply. A guess here swings the whole masonry price.

  • Scaffolding is left out

    Height drives scaffolding, hoisting and productivity. Bids that ignore it look cheap until the crew is on the wall.

Scope

What do we measure in a masonry takeoff?

Every masonry item is measured from your sheets and carried in the units your crews and suppliers price in.

  • CMU · 8" Loadbearing
  • Face Brick Veneer
  • Grout · Solid Cells
  • Joint Reinforcing
  • Lintels & Bearing Plates
SFwall area by unit type
CYgrout volume
LFjoint reinforcing, flashing, control joints
EAlintels, bearing plates, anchors
MSFbrick per thousand
How we price it

How is a masonry estimate priced?

Masonry is measured by wall type because unit size, bond pattern, grout fill and reinforcing change the cost of every square foot. We take off each wall type separately and convert area to unit counts using the actual unit dimensions in the specification.

Labor productivity drops with height, cut work and pattern complexity. Scaffolding, mixing, cleaning and protection are carried as visible lines so they can be adjusted to your crews.

Method

What do our estimators check on a masonry set?

We read the wall sections first to separate each wall assembly, then measure length and height from the plans and elevations. Openings are deducted using the door and window schedules, and lintel and bond beam locations are marked from the structural details.

Units are converted from area using the specified unit size and joint thickness. We list mortar type, grout fill pattern, reinforcing and ties from the specification, and add flashing, weeps and control joints from the details. Height drives scaffolding, so each lift is noted.

Risk

What do masonry bids usually miss?

These are the items we check on every set, because they are where bids lose money.

  1. 01

    Which cells are actually grouted, the structural notes rarely match the elevation count.

  2. 02

    Scaffolding and mast climbers, priced by wall height and duration rather than by area.

  3. 03

    Cold-weather and hot-weather protection where the schedule puts the wall in the wrong season.

  4. 04

    Cavity flashing, weeps, cavity drainage and air barrier tie-ins at every horizontal break.

Deliverable

What does a masonry estimate look like?

Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.

Masonry estimate.xlsxIllustrative sample
Illustrative line items, not from a client project
CSIItemQuantity
04 22 00Cmu, 8" loadbearing3,180 SF
04 21 00Face brick veneer1,240 SF
04 05 16Grout, solid cells31 CY
04 05 23Joint reinforcing2,960 LF
05 50 00Lintels & bearing pl.42 EA

Illustrative structure only. Your estimate is measured from your own drawings.

Projects

What kinds of masonry projects do we estimate?

We estimate masonry for block and brick buildings, veneers, retaining walls and stone feature walls. Walls are measured by assembly, with units, mortar, grout and accessories listed so crews and suppliers can use the same numbers.

Why Nova

Why use Nova Estimation for masonry estimating?

  • Wall type by wall type

    Each wall assembly is measured separately, with unit size and bond pattern read from the specification.

  • Accessories counted, not allowed

    Lintels, ties, flashing, weeps and control joints come from the details, not from a percentage.

  • Height-adjusted labor notes

    Scaffolding and productivity notes sit beside the quantities so your crew lead can adjust them.

Who orders it

Who orders a masonry estimate?

  1. 01

    Masonry contractors pricing block, brick or stone scopes

  2. 02

    General contractors comparing masonry subcontractor bids

  3. 03

    Home builders pricing veneer and foundation walls

What to send

What should you send for a masonry estimate?

These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.

  • Architectural plans, elevations and wall sections
  • Structural drawings for reinforcing and lintels
  • Masonry specification sections
  • Unit and mortar requirements
  • Addenda and bid forms
  • Any mock-up or sample requirements
How it works

How do you order a masonry estimate?

You know the fee and the delivery date before we start. No retainers and no hourly billing.

  1. Upload

    Send the architectural and structural sheets, wall sections and the masonry specification.

    About 2 minutes
  2. Quote

    We confirm unit types, grout fill and whether veneer and CMU are both in scope, then send the fee.

    Within the hour
  3. Estimate

    Walls are measured by assembly and converted to unit counts using the specified unit size.

    24 to 48 hours
  4. Deliver

    You receive the workbook with marked-up elevations and a unit, mortar and grout summary.

    Bid day ready

Bidding masonry this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

Pricing

How much does a masonry estimate cost?

A masonry estimate is quoted as a fixed fee based on the number of wall sheets, the number of distinct wall types and whether veneer, CMU and stone are all in the scope.

Simple single-wythe block buildings take less measuring than multi-wythe walls with stone accents, and the fee reflects that. You see the figure before anything starts.

FAQ

Masonry estimating questions

Both. Walls are measured by area, then converted to unit counts using the specified unit size, so you can order material and price labor from the same takeoff.

Yes. Grout is calculated from the fill pattern, solid or by cell spacing, and reinforcing from the structural drawings.

Openings are deducted by size, with lintels, bond beams and jamb reinforcing counted for each one.

Yes. Ties, flashing, weeps and control joints are measured from the wall sections and details.

Yes. Natural and manufactured stone are measured by area with corners and trim pieces counted separately.

The fee is fixed and quoted free within the hour on working days, based on wall types, sheet count and scope. There is no retainer and no minimum.

Most masonry estimates arrive in 24 to 48 hours from approval, with the delivery date confirmed in the quote.

Scaffolding is carried as its own line based on wall height and elevations, so you can swap in your own rental pricing.

Yes, when the existing conditions are documented. Repointing and cleaning are measured by area with notes on access and mortar type.

Related trades

More structural trades we estimate

Get a fixed quote

Get a fixed quote for your masonry takeoff

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.