Nova Estimation

CPM Scheduling Services

CPM scheduling builds a construction schedule from activities, durations and logic so the critical path is clear. Nova Estimation prepares baseline schedules in Primavera P6 or Microsoft Project, loads activities with cost from the estimate when required, and provides schedule updates that show progress and delays against the baseline.

  • Fixed fee before work starts
  • Editable Excel and marked-up PDFs
  • Second estimator QA check
Overview

What is a CPM schedule?

The critical path method schedules a project as a network of activities linked by logic. The longest chain of dependent activities sets the finish date, and any delay on that chain delays the project.

We build schedules from your drawings, specifications and means and methods, with durations based on quantities from the estimate. When an owner or contract requires it, each activity is loaded with its cost so the schedule also forecasts cash flow.

During construction, we update the schedule with actual progress, report changes to the critical path and identify the activities that need attention to protect the finish date.

The problem

Why do contractors struggle with CPM scheduling?

  • Schedules and budgets live apart

    A schedule that ignores cost cannot show cash flow, and a budget that ignores sequence cannot show risk.

  • Logic is weak

    Activities without proper links produce a schedule that cannot be tested.

  • Updates fall behind

    Without regular updates, the schedule stops reflecting the job.

Scope

What do our scheduling services include?

  • Baseline CPM schedule in Primavera P6 or MS Project
  • Durations based on measured quantities
  • Cost-loaded activities and cash flow forecast
  • Monthly or periodic schedule updates
  • Critical path and float reporting
  • Narratives written to contract requirements
Method

How do we prepare CPM scheduling?

We break the project into work packages from the estimate, assign durations from production rates and link activities with logic. The critical path is checked for realism.

Costs from the estimate are loaded onto the activities so you can see cash flow by month.

Why Nova

Why use Nova Estimation for CPM scheduling?

  • Logic-linked schedules

    Activities are linked and the critical path is shown.

  • Cost loaded

    Activities carry cost from the estimate for cash flow.

  • Native files

    Schedules arrive in Primavera P6 or Microsoft Project.

Who it is for

Who uses our CPM scheduling?

  1. 01

    Contractors needing baseline schedules

  2. 02

    Owners requiring cost-loaded schedules

  3. 03

    Projects with schedule specifications

Projects

Which projects do we cover with CPM scheduling?

We prepare schedules for contractors, owners and claims consultants on commercial, industrial and infrastructure projects.

What to send

What should you send for CPM scheduling?

Missing items are flagged in the quote, not guessed.

  • Drawings and specifications
  • The cost estimate
  • Milestone and completion dates
  • Contract time requirements
  • Calendar assumptions
  • Existing schedule if any
How it works

How do you order CPM scheduling?

You know the fee and the delivery date before we start. No retainers and no hourly billing.

  1. Upload

    Send the drawings, the estimate and the milestone dates.

    About 2 minutes
  2. Quote

    We confirm the scope and software, then send the fee.

    Within the hour
  3. Estimate

    We build the logic network, durations and cost loading.

    24 to 48 hours
  4. Deliver

    You receive the schedule file and a narrative.

    Bid day ready

Need CPM scheduling this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

Pricing

How much does CPM scheduling cost?

A CPM schedule is a fixed fee that depends on project size, the number of activities and whether updates are included.

A small building is quicker than a campus. The quote arrives free, usually within the hour on working days.

FAQ

CPM Scheduling questions

Oracle Primavera P6 and Microsoft Project. Schedules can be delivered in native format, PDF and Excel.

A schedule where each activity carries its share of the contract value, so the schedule forecasts monthly cash flow and supports pay applications.

Yes. Send us the scheduling specification and we will build the baseline and narrative to its requirements.

Yes. Updates record actual progress, recalculate the critical path and include a narrative of changes and delays.

Yes. Using our own quantities makes durations more realistic and lets cost loading come straight from the estimate.

A fixed fee quoted free within the hour on working days.

The plans, the scope, the target dates and any known constraints, such as phasing or lead times.

Yes. Costs from the estimate are loaded onto activities.

Yes. In a cost-loaded schedule each activity carries its cost.

Get a fixed quote

Get a fixed quote for CPM scheduling

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.