Structural Steel Estimating Services
Structural steel estimating measures every beam, column, brace and connection in the structural drawings and converts it to tonnage for fabrication and erection pricing. Nova Estimation takes off steel member by member, adds connection allowances, decking and miscellaneous metals, and delivers a steel estimate in 24 to 48 hours.
- CSI Division 05 Metals
- 24 to 48 hour delivery
- Excel + marked-up PDFs
Why do structural steel bids go wrong?
-
Tonnage that ignores connections
Beams and columns weigh what the schedule says, but connection material and bolts add real tonnage that bids often leave out.
-
Decking and miscellaneous metals fall between trades
Metal deck, stairs, rails and lintels end up in nobody's scope until the buyout meeting.
-
Shop drawings change the quantity
Revisions between design drawings and shop drawings move the weight, and the estimate should show where its numbers came from.
What do we measure in a structural steel takeoff?
Every structural steel item is measured from your sheets and carried in the units your crews and suppliers price in.
- Structural Steel
- Connection Material
- Steel Deck · 1.5b
- Open-web Joists
- Miscellaneous Metals
How is a structural steel estimate priced?
Steel is bought by weight and erected by piece, so we measure both. Each member is listed with its size, length and weight per foot, and the piece count drives erection labor and crane time.
Connections are rarely fully detailed at bid stage, so we carry them as a stated percentage of member weight and show it separately. Metal decking, shear studs, embeds and miscellaneous metals such as stairs, railings and lintels have their own lines.
What do our estimators check on a structural steel set?
Framing plans give member sizes and lengths, but the schedules and details decide connection types, so we read them together. Beams, columns and braces are listed with section, length and weight, and floor and roof framing are kept separate.
Connections are added by type from the details, and bolts, welds and shear studs are carried as their own lines. Metal deck is measured by area and gauge, and stairs, rails and lintels are listed as miscellaneous metals so they are not missed. Tonnage is reconciled against the schedule before delivery.
What do structural steel bids usually miss?
These are the items we check on every set, because they are where bids lose money.
- 01
Connection material and shop labor, which the mill tonnage does not include.
- 02
Erection sequencing, crane time and bolt-up, priced by piece count rather than tonnage.
- 03
Shop primer versus field paint and any intumescent fireproofing carried by another trade.
- 04
Miscellaneous metals, lintels, embeds, stairs, railings, that sit outside the frame takeoff.
What does a structural steel estimate look like?
Line items are organized by CSI code with quantities you can trace back to the marked-up sheets.
| CSI | Item | Quantity |
|---|---|---|
| 05 12 00 | Structural steel | 12.4 T |
| 05 12 23 | Connection material | 1.1 T |
| 05 31 00 | Steel deck, 1.5b | 4,600 SF |
| 05 21 00 | Open-web joists | 38 EA |
| 05 50 00 | Misc. metals | 0.7 T |
Illustrative structure only. Your estimate is measured from your own drawings.
What kinds of structural steel projects do we estimate?
We estimate structural steel for warehouses, offices, retail, schools and mid-rise frames. Each estimate lists members by size and weight, with connections, deck and miscellaneous metals shown separately.
Why use Nova Estimation for structural steel estimating?
-
Member by member
Every beam, column and brace is listed with size, length and weight, so tonnage traces back to the schedule.
-
Connections and bolts included
Connection allowances and fasteners are carried explicitly, not hidden in a rate.
-
Deck and miscellaneous metals itemized
Metal deck, stairs, handrails and lintels are separate lines, so scope gaps show up before bid day.
Who orders a structural steel estimate?
- 01
Steel fabricators and erectors pricing a package
- 02
General contractors checking a steel subcontractor's tonnage
- 03
Developers testing a structural budget at schematic stage
What should you send for a structural steel estimate?
These documents let us measure the trade completely. Missing items are flagged in the quote, not guessed.
- Structural framing plans and elevations
- Steel schedules and connection details
- Metal deck and miscellaneous metal drawings
- Steel specification sections
- Addenda and bid forms
- Shop drawings if available
How do you order a structural steel estimate?
You know the fee and the delivery date before we start. No retainers and no hourly billing.
Upload
Send the structural framing plans, the steel schedules, details and the specification section.
About 2 minutesQuote
We confirm whether fabrication, erection, deck and miscellaneous metals are in scope.
Within the hourEstimate
Members are taken off by size and length and converted to tons, then priced to your ZIP code.
24 to 48 hoursDeliver
You receive the workbook with a marked-up framing plan and a tonnage summary by member type.
Bid day ready
Bidding structural steel this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
How much does a structural steel estimate cost?
A structural steel estimate is a fixed fee that depends on the number of framing sheets, the variety of member sizes and whether connections, deck and miscellaneous metals are included.
Regular rectangular frames are faster to measure than complex frames with heavy transfer beams. Send your drawings and the fee arrives free, within the hour on working days.
Structural Steel estimating questions
From the member sizes and lengths on the structural plans, using the published weight per foot for each section, plus a stated allowance for connections.
Yes. Floor and roof deck are measured by area and gauge, with shear studs, closures and edge forms counted separately.
Yes. Stairs, railings, ladders, lintels, embeds and support steel are measured as miscellaneous metals under their own heading.
We estimate the foundations, slab and trades around the building. The building package itself usually comes as a vendor quote.
Yes. Erection is priced from piece count and weight, with crane time shown as its own line so it can be matched to your plan.
The fee is fixed per project and quoted free within the hour on working days, with no retainer and no minimum.
Typically 24 to 48 hours from approval. Large buildings with many member sizes may take longer, and the quote shows the date.
Yes. Material, fabrication, shop painting and erection can be carried as separate lines so you can compare against subcontractor quotes.
Yes. Shop drawings give the most exact tonnage, and we measure from them when they are available.
More structural trades we estimate
Get a fixed quote for your structural steel takeoff
Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.