Nova Estimation

How to Estimate Construction Costs

To estimate construction costs, review the scope, measure quantities from the drawings, price material, labor, equipment and subcontract work for each item, add general conditions and overheads, apply contingency and profit, and review the result. Writing down assumptions, inclusions and exclusions at every step is what makes the estimate usable.

Last updated

Step 1: What is the scope?

Read the drawings, specifications and addenda, and list what is and is not part of the job. Note the project location, schedule and any owner requirements that affect cost, such as prevailing wages or phasing.

Step 2: How do you take off quantities?

Measure every item by trade, in the unit that trade buys and installs in. Keep each quantity linked to its sheet, and show waste separately from net quantity.

Step 3: How do you price each item?

Direct cost has three parts. Material comes from supplier quotes or cost data. Labor is the hours an item needs multiplied by the crew's rate. Equipment is the rental or ownership cost for the time it is on site. Work done by subcontractors is priced from their quotes.

  • Material cost: quantity multiplied by unit price
  • Labor cost: hours multiplied by rate, including burden
  • Equipment cost: time on site multiplied by rate
  • Subcontract cost: leveled quotes for the scope

Step 4: What indirect costs are added?

General conditions are the costs of running the job: supervision, temporary facilities, insurance, permits and cleanup. Company overhead covers the cost of running the business. Both are added on top of the direct cost.

Step 5: How do you add contingency and profit?

Contingency covers risk that cannot be measured and is usually higher when the design is less complete. Profit is applied last. Decide each percentage deliberately, and apply each only once.

Step 6: How do you review the estimate?

Compare the total with cost per square foot or another benchmark, look for divisions with no cost, and have a second estimator check quantities and extensions. A review catches errors while they are still cheap to fix.

Bid due this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

FAQ

Frequently asked questions

Missing scope, followed by unit errors and prices that are out of date.

Either works. Software speeds up measuring, and Excel is a flexible way to price and summarize.

Use allowances for undefined work and list them clearly, so they can be replaced as the design develops.

Yes. Nova provides takeoffs and priced estimates for a fixed fee, usually in 24 to 48 hours.

Read the specifications and drawings, then list every scope before you measure anything.

No, but takeoff and spreadsheet tools save time and reduce errors on all but the smallest jobs.

Get a fixed quote

Ready to price your next bid?

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.