Nova Estimation

RSMeans Cost Data Explained

RSMeans is a published construction cost database, now produced by Gordian. It lists unit costs for material, labor and equipment, organized by CSI division, with location factors that adjust national averages to a city. Estimators use it for budgets and checks, then compare it with local quotes and their own history.

Last updated

What is RSMeans data?

RSMeans data is a library of construction cost lines. Each line describes an item of work, gives a unit of measure, and splits the cost into material, labor and equipment. Lines are numbered by CSI MasterFormat division, so they match specifications and estimates.

It is published as books and as online subscription products. Check the publisher's site for the current editions and what each includes.

How do estimators use it?

  • Conceptual and early design budgets, when there are no quotes yet
  • Checking a bid estimate for lines that look too high or too low
  • Pricing items that no subcontractor or supplier has quoted
  • Comparing owner and contractor estimates on the same basis

What are location factors?

Construction cost varies by city. RSMeans publishes city cost indexes that adjust national average costs to a chosen location. Applying the right index is one of the most important steps when using the data, because skipping it can move a total by a large margin.

What should you check before relying on it?

  • The year of the data and whether prices have been escalated to your bid date
  • Whether labor rates are union, open shop or prevailing wage
  • Whether overhead and profit are included in the line or added separately
  • Whether the line matches the real scope, including quality level and site access
  • Whether recent local quotes are available to compare

How is it different from your own prices?

Published data is an average. Your own subcontractor quotes, supplier prices and job history reflect your market, your crews and your terms. Most estimators use published data to fill gaps and test results, and use their own prices wherever they have them.

Bid due this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

FAQ

Frequently asked questions

It is a well known average, so it is a sound starting point, but it is only as accurate for your job as the location, date and scope you apply.

Many lines show costs with and without overhead and profit. Check how each line you use is presented.

No. Contractors also use their own cost history and current quotes. Published data is mostly used for budgets and checks.

We price from current local information for your project ZIP code and tell you what each estimate is based on.

No. RSMeans is a paid cost database. We explain how it works and how estimators use it, and we price with the data sources our clients specify.

Published cost data is updated each year, and estimators apply location and time adjustments.

Get a fixed quote

Ready to price your next bid?

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.