Types of Construction Estimates
There are five common types of construction estimate: conceptual or order of magnitude, square foot, assembly or elemental, unit price, and detailed bid estimates. They differ in how much design information they need and how accurate they are, and projects usually move from the first type to the last as drawings develop.
Last updated
What is a conceptual estimate?
A conceptual or order-of-magnitude estimate is prepared before there is a design, often from a building type and size. It uses costs from comparable projects and carries a wide accuracy range. Its job is to test feasibility.
What is a square foot estimate?
A square foot estimate multiplies the building area by a cost per square foot for similar buildings, adjusted for location and quality. It is quick but cannot reflect the specifics of a design.
What is an assembly estimate?
An assembly or elemental estimate prices building elements such as foundations, exterior walls or roofing using composite rates. It suits schematic design, when elements are known but not fully detailed.
What is a unit price estimate?
A unit price estimate measures quantities and multiplies each by a unit rate. It is common in civil and public work, where bids are submitted as a schedule of unit prices.
What is a detailed bid estimate?
A detailed estimate measures every item from construction documents and prices material, labor and equipment line by line. It is the most accurate type and the one contractors use to bid.
How do the types compare?
| Type | Design stage | Information needed |
|---|---|---|
| Conceptual | Before design | Building type and size |
| Square foot | Concept | Area and quality level |
| Assembly | Schematic | Building elements |
| Unit price | Bid (civil) | Quantities by bid item |
| Detailed bid | Construction documents | Complete drawings and specs |
Bid due this week?
Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.
Frequently asked questions
A detailed bid estimate from complete construction documents.
A conceptual estimate for feasibility, then more detailed estimates at each design stage.
Yes. Measured quantities from early estimates carry forward as the design develops.
All of them, from preconstruction budgets to detailed bid estimates.
A detailed estimate prepared from complete construction documents, because every item is measured.
Start with a conceptual or order-of-magnitude estimate to test feasibility, then move to detailed estimates as the design develops.
Which estimating service helps with this?
-
Construction Estimating
Priced estimates across every CSI division
-
Quantity Takeoff
Measured quantities with color-coded markups
-
Pre-Construction
Budgets before there is a full drawing set
-
Bid & Procurement
Bid packages, scope sheets and bid leveling
-
Construction Cost Consulting
Independent cost reviews and change order pricing
-
Dedicated Estimating
A named estimator working only your bids
-
Specialized Services
BIM, scheduling and insurance repair estimating
Ready to price your next bid?
Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.