What Is Construction Estimating?

Construction estimating is the process of predicting what a building project will cost before it is built. An estimator measures the quantities shown in the drawings, prices the material, labor and equipment needed for each item, and adds overheads, contingency and markup to reach a total that can be used for a bid or a budget.

Last updated

What does a construction estimator do?

An estimator reads the drawings and specifications, measures every item of work, and prices it. The measuring part is called the takeoff. The pricing part applies material costs, labor productivity and equipment to each quantity.

A good estimator also reads between the lines: what the drawings do not show, what the specifications require and what the site conditions will add. Those judgments are written down as assumptions, inclusions and exclusions.

How is a construction estimate built?

Most estimates follow the same sequence. First the scope is understood. Then quantities are measured by trade and organized by CSI division. Then each quantity is priced, and finally overheads, general conditions, contingency and markup are added.

  • Review drawings, specifications and addenda
  • Measure quantities by trade (the takeoff)
  • Price material, labor and equipment
  • Add general conditions and overheads
  • Apply contingency and markup
  • Write down inclusions, exclusions and assumptions

What are the main types of construction estimate?

Estimates become more detailed as the design develops. A conceptual estimate uses cost per square foot from similar buildings. A schematic or design development estimate measures what is drawn and uses allowances for the rest. A detailed or bid estimate measures everything from construction documents.

What makes an estimate accurate?

Accuracy depends on the completeness of the drawings, the quality of the takeoff and the cost data used. The most common causes of error are missed scope, wrong units, outdated prices and productivity assumptions that do not match the actual work.

Two habits make the biggest difference: measuring from the drawings rather than estimating by rule of thumb, and having a second person check the estimate before it is used.

Bid due this week?

Send the plans and bid date today. You get a fixed fee and delivery time before any work starts.

FAQ

Frequently asked questions

They overlap. In the US the role is usually called estimating; in the UK, quantity surveying covers estimating plus cost management through a project.

From hours for a single trade to weeks for a large building in-house. Outsourced estimators such as Nova deliver most estimates in 24 to 48 hours.

Takeoff software such as Bluebeam or PlanSwift for measuring, and Excel or estimating software for pricing.

An amount added for risks and unknowns that cannot be measured, usually larger at early design stages.

Estimators at contractors, subcontractors, owners and consulting firms prepare estimates, often with specialist help.

Accuracy depends on the stage and the drawings. A detailed estimate from complete documents is the most accurate.

Get a fixed quote

Ready to price your next bid?

Tell us what you are bidding in three short steps. We reply with a fixed fee and a delivery date before any work starts.

See sample estimates

What do you need?

Choose one service. You can add more later.

Which trades should we price?

Pick any trades, or choose all trades for a full GC estimate.

Structural and sitework

Architectural

MEP and specialty

About the project

Upload the plan set or paste a link. Add a note if anything needs explaining.